SHS Power

How many solar installs has SHS Power done in California, and which license number is on its installs?

SHS Power has 42 residential solar installs interconnected in California, active in the records from 2022 through 2026 (Apr 7, 2022 to Jul 21, 2026), most of them in San Diego County (35), Riverside County (3) and Los Angeles County (2). CSLB lists license 1082533 (SHS POWER) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Oct 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
42
Last 24 months
29
Total capacity
373.3 kW DC
Median system size
9.2 kW DC
With battery storage
33.3% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 33.3% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
0.0% of 42 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
30 installs, latest Jul 21, 2026
Ownership types recorded
none recorded
Median battery size
35 kWh (2 installs list a capacity)
First install
Apr 7, 2022
Latest install
Jul 21, 2026
Counties
4
Utilities
SDGE 36, SCE 6
CSLB license
1082533

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2022 to 2026

YearInstalls interconnectedWith battery storage
202210
202360
202480
2025150
2026 (through Aug 31, 2026)122

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

30 of its 42 interconnected installs (71.4% of the 42 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 33.3% of those on PG&E and SCE records include battery storage. The latest Net Billing Tariff install was approved Jul 21, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.01228.6%not recorded
Net Billing Tariff3071.4%2 (33.3%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on SHS Power’s installs. No residential system in the file lists a third-party owner name that matches SHS Power exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 28 of SHS Power’s 29 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (12, 42.9%) used modules recorded as Aptos Solar.

In the last 24 months, 29 of SHS Power’s 29 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (11, 37.9%) used inverters recorded as EG4.

In the last 24 months, 1 of SHS Power’s 29 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (1, 100.0%) used batteries recorded as Tesla.

1 of 2 battery-paired PG&E and SCE installs (50.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerAptos Solar1212
CertainTeed88
HDHYUNDAIENERGYSOLUTIONSCO.,LTD.33
EG41not in top list
PhonoSolarTechnologyCo.,Ltd.1not in top list
Inverter makerEG41111
Tesla1112
Enphase35
Sol-Ark310
NeoVoltaInc.1not in top list
Battery makerTesla11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 40 of 42 installs, inverters on 42. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1082533SHS POWER (Limited Liability)CLEARC-10 Electrical ContractorOct 13, 2021Oct 31, 202742

License numbers are the ones the utilities recorded on the interconnection applications (42 of 42 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1082533. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list SHS Power’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense2023202420252026Total
unincorporated San Diego County10825332113925

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
San Diego35
Riverside3
Los Angeles2
Orange2

Top cities

CityInstalls
San Diego11
Chula Vista6
Bonita3
El Cajon2
Escondido2
Fallbrook2
Lakeside2
Poway2
Claremont1
Corona1
Coronado1
Eastvale1
Garden Grove1
Jamul1
La Jolla1

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
SHS Power36
SHS POWER6

Common questions

Where does SHS Power install solar?

Its installs are spread across 4 counties. The most are in San Diego County (35 installs), followed by Riverside County (3).

How often does SHS Power install batteries with solar?

33.3% of its interconnected solar installs include battery storage across all years, and 33.3% in the last 24 months (2 of 6). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many SHS Power installs are under NEM 3.0 (the Net Billing Tariff)?

30 of its 42 interconnected installs (71.4% of the 42 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 33.3% of those on PG&E and SCE records include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.