Solar 360 Building

How many solar installs has Solar 360 Building done in California, and which license number is on its installs?

Solar 360 Building has 42 residential solar installs interconnected in California, active in the records from 2013 through 2015 (Dec 17, 2013 to Apr 24, 2015), most of them in Orange County (19), Los Angeles County (11) and San Bernardino County (7). The utilities did not record a CSLB license number on enough of these installs to look one up.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
42
Last 24 months
0
Total capacity
258.5 kW DC
Median system size
5.5 kW DC
With battery storage
0.0% all time; no installs in the last 24 months last 24 months
Third-party owned
ownership not recorded on its installs
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
none recorded
First install
Dec 17, 2013
Latest install
Apr 24, 2015
Counties
4
Utilities
SCE 42
CSLB license
none reported

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2013 to 2026

YearInstalls interconnectedWith battery storage
201310
2014270
2015140
201600
201700
201800
201900
202000
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 42 interconnected installs with a tariff recorded (42) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.042100.0%not counted
NEM 2.000.0%0
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Solar 360 Building’s installs. No residential system in the file lists a third-party owner name that matches Solar 360 Building exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 42 of Solar 360 Building’s 42 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (28, 66.7%) used inverters recorded as SMA.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Inverter makerSMA028
Enphase014

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 0 of 42 installs, inverters on 42. See the methodology and the equipment index.

Contractor license

The utilities did not record a license number for enough of these installs to look one up.

License numbers are the ones the utilities recorded on the interconnection applications (0 of 42 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it.

Counties

CountyInstalls
Orange19
Los Angeles11
San Bernardino7
Riverside5

Top cities

CityInstalls
Orange6
Diamond Bar2
Fullerton2
Irvine2
Moreno Valley2
San Bernardino2
Aliso Viejo1
Apple Valley1
Arcadia1
Bellflower1
Cerritos1
Chino1
Corona1
Desert Hot Springs1
El Monte1

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
SOLAR 360 BUILDING31
Solar 360 Building11

Common questions

Where does Solar 360 Building install solar?

Its installs are spread across 4 counties. The most are in Orange County (19 installs), followed by Los Angeles County (11).

How often does Solar 360 Building install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years.

How many Solar 360 Building installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 42 interconnected installs with a tariff recorded (42) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.