Solar Revolution
How many solar installs has Solar Revolution done in California, and which license number is on its installs?
Solar Revolution has 300 residential solar installs interconnected in California, active in the records from 2014 through 2024 (Jun 24, 2014 to Oct 15, 2024), most of them in El Dorado County (106), Placer County (96) and Sutter County (22). CSLB lists license 522050 (sole owner license, name not shown) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, expires Dec 31, 2027.
License status changes daily. Confirm it on CSLB’s own license check before relying on it.
The installs credited to Solar Revolution here carry more than one CSLB license number: 522050 on 221 (CSLB holder Sole owner license (name not shown)) and 1036037 on 76 (CSLB holder ELECTRIC REVOLUTION, Folsom), in the License Master file pulled Nov 4, 2026. They are grouped under one installer by the name written on the applications; the records do not say whether these numbers belong to the same legal entity.
- Interconnected installs
- 300
- Last 24 months
- 1
- Total capacity
- 2,160.6 kW DC
- Median system size
- 6.5 kW DC
- With battery storage
- 0.7% all time; 0.0% last 24 months
- Third-party owned
- 0.0% of 300 installs where ownership was reported
- Net Billing Tariff (NEM 3.0)
- 1 installs, latest Oct 15, 2024
- Ownership types recorded
- none recorded
- First install
- Jun 24, 2014
- Latest install
- Oct 15, 2024
- Counties
- 19
- Utilities
- PGE 300
- CSLB license
- 522050, 1036037
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installs by year, 2014 to 2026
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2014 | 24 | 0 |
| 2015 | 76 | 0 |
| 2016 | 77 | 0 |
| 2017 | 39 | 0 |
| 2018 | 43 | 1 |
| 2019 | 34 | 0 |
| 2020 | 0 | 0 |
| 2021 | 0 | 0 |
| 2022 | 2 | 1 |
| 2023 | 4 | 0 |
| 2024 | 1 | 0 |
| 2025 | 0 | 0 |
| 2026 (through Aug 31, 2026) | 0 | 0 |
Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)
1 of its 300 interconnected installs (0.3% of the 300 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 0.0% of those include battery storage. The latest Net Billing Tariff install was approved Oct 15, 2024.
| Tariff recorded by the utility | Installs | Share of installs with a tariff | With battery storage |
|---|---|---|---|
| NEM 1.0 | 179 | 59.7% | not counted |
| NEM 2.0 | 120 | 40.0% | 2 (1.7%) |
| Net Billing Tariff | 1 | 0.3% | 0 (0.0%) |
The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.
Leases, PPAs and third-party owners
The utilities recorded no third-party ownership type (PPA or lease) on Solar Revolution’s installs. No residential system in the file lists a third-party owner name that matches Solar Revolution exactly.
Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.
Equipment recorded
In the last 24 months, 1 of Solar Revolution’s 1 installs name a module maker in the “Generator Manufacturer” fields, and most of those (1, 100.0%) used modules recorded as Qcells.
In the last 24 months, 1 of Solar Revolution’s 1 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (1, 100.0%) used inverters recorded as Enphase.
In the last 24 months, none of Solar Revolution’s 1 installs name a battery maker in the “Generator Manufacturer” fields; the fields are blank or unreadable on those records.
2 of 2 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | Qcells | 1 | 42 |
| Inverter maker | Enphase | 1 | 50 |
| Battery maker | Enphase | 0 | 1 |
| LG | 0 | 1 |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 300 of 300 installs, inverters on 300. See the methodology and the equipment index.
SGIP battery storage projects
The SGIP report names Solar Revolution as developer on 10 battery storage projects and as installer on 11 (10 name it as both), 11 projects in all with 210 kWh of storage. 4 have the status Paid, with $12,715 in current incentive allocations. Applications were received from Nov 13, 2017 to Sep 2, 2025.
By status
| Status as published | Projects | Storage kWh | Current incentive |
|---|---|---|---|
| Paid | 4 | 68 | $12,715 |
| Reserved | 1 | 19 | $3,982 |
| Cancelled | 5 | 114 | $33,147 |
| RRF Rejected | 1 | 10 | $0 |
By budget category
| Budget category | Projects | Storage kWh | Current incentive | Paid projects | Paid: current incentive |
|---|---|---|---|---|---|
| Small Residential Storage | 6 | 93 | $15,629 | 3 | $6,309 |
| Large-Scale Storage | 3 | 98 | $24,509 | 1 | $6,406 |
| Equity Resiliency | 1 | 10 | $9,706 | 0 | $0 |
| Not stated | 1 | 10 | $0 | 0 | $0 |
Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.
A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.
Contractor license
| License | CSLB business name | CSLB status, file pulled Nov 4, 2026 | Classifications | Issued | Expires | Installs reported |
|---|---|---|---|---|---|---|
| 522050 | Sole owner license (name not shown) | CLEAR | B General Building Contractor; C-10 Electrical Contractor | Dec 23, 1987 | Dec 31, 2027 | 221 |
| 1036037 | ELECTRIC REVOLUTION (Corporation) | CLEAR | C-46 Solar Contractor | Feb 20, 2018 | Feb 29, 2028 | 76 |
License numbers are the ones the utilities recorded on the interconnection applications (297 of 300 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.
Disciplinary bonds and pending actions in the License Master file
The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for licenses 522050, 1036037. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.
Other names reported under the same license
- ELECTRIC REVOLUTION: 165 installs, license 1036037
Counties
| County | Installs |
|---|---|
| El Dorado | 106 |
| Placer | 96 |
| Sutter | 22 |
| Calaveras | 15 |
| Yolo | 12 |
| Nevada | 9 |
| San Joaquin | 9 |
| Amador | 7 |
| Yuba | 6 |
| Butte | 3 |
| San Mateo | 3 |
| Contra Costa | 2 |
| Mendocino | 2 |
| Solano | 2 |
| Sonoma | 2 |
| Alameda | 1 |
| Colusa | 1 |
| Glenn | 1 |
| Napa | 1 |
Top cities
| City | Installs |
|---|---|
| El Dorado Hills | 50 |
| Granite Bay | 31 |
| Auburn | 17 |
| Lincoln | 17 |
| Yuba City | 17 |
| Rocklin | 15 |
| Cameron Park | 13 |
| Placerville | 13 |
| Shingle Springs | 13 |
| Meadow Vista | 8 |
| Valley Springs | 8 |
| Grass Valley | 6 |
| Davis | 5 |
| Ione | 4 |
| Marysville | 4 |
Names as recorded by the utilities
The utilities recorded this installer under 5 spellings. See the methodology for how spellings are combined.
| Installer name as recorded | Installs |
|---|---|
| Solar Revolution | 272 |
| solar revolution | 22 |
| Solar revolution | 3 |
| SOLAR REVOLUTION | 2 |
| Solar REVOLUTION | 1 |
Common questions
Where does Solar Revolution install solar?
Its installs are spread across 19 counties. The most are in El Dorado County (106 installs), followed by Placer County (96).
How often does Solar Revolution install batteries with solar?
0.7% of its interconnected solar installs include battery storage across all years, and 0.0% in the last 24 months (0 of 1).
How many Solar Revolution installs are under NEM 3.0 (the Net Billing Tariff)?
1 of its 300 interconnected installs (0.3% of the 300 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 0.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
- Self-Generation Incentive Program (SGIP) program administrators: Real-Time Public Report of SGIP applications (selfgenca.com)
Records last pulled Nov 16, 2026. Every entry links to the original public record.