SON LIGHT CONSTRUCTION INC

How many solar installs has SON LIGHT CONSTRUCTION INC done in California, and which license number is on its installs?

SON LIGHT CONSTRUCTION INC has 446 residential solar installs interconnected in California, active in the records from 2019 through 2026 (Nov 5, 2019 to Jul 15, 2026), most of them in Kern County (399), Tulare County (26) and Fresno County (7). The license number recorded on most of its installs, 1048042, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
446
Last 24 months
208
Total capacity
4,206.6 kW DC
Median system size
8.9 kW DC
With battery storage
65.2% all time; 83.2% last 24 months
Third-party owned
29.4% of 446 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
287 installs, latest May 15, 2026
Ownership types recorded
PPA 131
Median battery size
13.5 kWh (71 installs list a capacity)
First install
Nov 5, 2019
Latest install
Jul 15, 2026
Counties
12
Utilities
PGE 396, SCE 50
CSLB license
1048042

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2019 to 2026

YearInstalls interconnectedWith battery storage
201910
202020
202100
202200
202311819
2024151129
2025154127
2026 (through Aug 31, 2026)2016

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

287 of its 446 interconnected installs (64.3% of the 446 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 93.0% of those include battery storage. The latest Net Billing Tariff install was approved May 15, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.092.0%not counted
NEM 2.015033.6%15 (10.0%)
Net Billing Tariff28764.3%267 (93.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 131 of SON LIGHT CONSTRUCTION INC’s installs the utility recorded a third-party ownership type: PPA 131, lease 0, prepaid lease 0, other 0. Across all installers, 1 residential systems list a third-party owner name that matches SON LIGHT CONSTRUCTION INC exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
Everbright42
Solkraft Inc.37
Goodleap22
Solwerks Power10
Modern Building5

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 182 of SON LIGHT CONSTRUCTION INC’s 208 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (89, 48.9%) used modules recorded as Znshine.

In the last 24 months, 208 of SON LIGHT CONSTRUCTION INC’s 208 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (158, 76.0%) used inverters recorded as Enphase.

In the last 24 months, 125 of SON LIGHT CONSTRUCTION INC’s 208 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (105, 84.0%) used batteries recorded as Enphase.

243 of 291 battery-paired PG&E and SCE installs (83.5%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerZnshine89222
Qcells6479
Mission Solar1314
Canadian Solar985
JA Solar77
Inverter makerEnphase158384
Qcells2828
Tesla2222
SolarEdge1226
APsystems (Altenergy Power System)2not in top list
Battery makerEnphase105223
Tesla2121

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 407 of 446 installs, inverters on 446. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names SON LIGHT CONSTRUCTION INC as developer on 2 battery storage projects and as installer on 1 (1 name it as both), 2 projects in all with 33 kWh of storage. 1 have the status Paid, with $2,142 in current incentive allocations. Applications were received from Jul 23, 2024 to May 2, 2025.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid114$2,142
Cancelled119$4,759

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Large-Scale Storage119$4,7590$0
Small Residential Storage114$2,1421$2,142

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1048042Not found in the CSLB License Master file pulled Nov 4, 2026444

License numbers are the ones the utilities recorded on the interconnection applications (446 of 446 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Counties

CountyInstalls
Kern399
Tulare26
Fresno7
Kings5
Plumas2
Contra Costa1
Los Angeles1
Merced1
Orange1
Placer1
San Joaquin1
San Luis Obispo1

Top cities

CityInstalls
Bakersfield320
Shafter19
Mc Farland14
Taft14
Visalia11
Wasco10
Tehachapi9
Porterville6
Fresno4
Tulare4
Delano3
Hanford3
California City2
Corcoran2
Lake Isabella2

Names as recorded by the utilities

The utilities recorded this installer under 4 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
SON LIGHT CONSTRUCTION INC442
Son Light Construction Inc.2
Son Light Construction1
Son Light Construction Inc1

Common questions

Where does SON LIGHT CONSTRUCTION INC install solar?

Its installs are spread across 12 counties. The most are in Kern County (399 installs), followed by Tulare County (26).

How often does SON LIGHT CONSTRUCTION INC install batteries with solar?

65.2% of its interconnected solar installs include battery storage across all years, and 83.2% in the last 24 months (173 of 208).

How many SON LIGHT CONSTRUCTION INC installs are under NEM 3.0 (the Net Billing Tariff)?

287 of its 446 interconnected installs (64.3% of the 446 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 93.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.