SOUTH WEST SOLAR INC

How many solar installs has SOUTH WEST SOLAR INC done in California, and which license number is on its installs?

SOUTH WEST SOLAR INC has 374 residential solar installs interconnected in California, active in the records from 2016 through 2026 (Aug 3, 2016 to Aug 31, 2026), most of them in Los Angeles County (200), Orange County (43) and Ventura County (41). CSLB lists license 1012298 (SOUTH WEST BUILDERS) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-7, C-10, expires Mar 31, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
374
Last 24 months
2
Total capacity
2,348.5 kW DC
Median system size
5.3 kW DC
With battery storage
1.9% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 100.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
0.8% of 374 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
2 installs, latest Aug 31, 2026
Ownership types recorded
PPA 3
Median battery size
9.8 kWh (7 installs list a capacity)
First install
Aug 3, 2016
Latest install
Aug 31, 2026
Counties
17
Utilities
SCE 335, PGE 27, SDGE 12
CSLB license
1012298

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2016 to 2026

YearInstalls interconnectedWith battery storage
201680
2017700
2018690
2019891
20201165
2021110
202230
202360
202400
202500
2026 (through Aug 31, 2026)21

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

2 of its 374 interconnected installs (0.5% of the 374 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 100.0% of those on PG&E and SCE records include battery storage. The latest Net Billing Tariff install was approved Aug 31, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.0154.0%not counted
NEM 2.035795.5%6 (1.7%)
Net Billing Tariff20.5%1 (100.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 3 of SOUTH WEST SOLAR INC’s installs the utility recorded a third-party ownership type: PPA 3, lease 0, prepaid lease 0, other 0. Across all installers, 2 residential systems list a third-party owner name that matches SOUTH WEST SOLAR INC exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
LightReach1
Palmetto1
SOUTH WEST SOLAR1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 2 of SOUTH WEST SOLAR INC’s 2 installs name a module maker in the “Generator Manufacturer” fields, and most of those (2, 100.0%) used modules recorded as Qcells.

In the last 24 months, 2 of SOUTH WEST SOLAR INC’s 2 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (2, 100.0%) used inverters recorded as Enphase.

In the last 24 months, 1 of SOUTH WEST SOLAR INC’s 2 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (1, 100.0%) used batteries recorded as Enphase.

7 of 7 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells244
Inverter makerEnphase247
Battery makerEnphase11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 374 of 374 installs, inverters on 374. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names SOUTH WEST SOLAR INC as developer on 1 battery storage project and as installer on 0 (0 name it as both), 1 projects in all with 8 kWh of storage. 0 have the status Paid, with $0 in current incentive allocations. Applications were received from Sep 25, 2020 to Sep 25, 2020.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Cancelled18$1,595

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage18$1,5950$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1012298SOUTH WEST BUILDERS (Corporation)CLEARB General Building Contractor; C-7; C-10 Electrical ContractorMar 22, 2016Mar 31, 2028356

License numbers are the ones the utilities recorded on the interconnection applications (357 of 374 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1012298. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list SOUTH WEST SOLAR INC’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense201820252026Total
City and County of San Francisco10122981304
unincorporated San Diego County10122980044

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
Los Angeles200
Orange43
Ventura41
San Bernardino31
Fresno17
Riverside15
Kern6
San Diego6
Tulare4
Contra Costa2
Kings2
Santa Barbara2
Madera1
Merced1
San Francisco1
Santa Clara1
Solano1

Top cities

CityInstalls
Palmdale19
Lancaster18
Fresno15
Long Beach11
Los Angeles11
Simi Valley9
Carson8
Lakewood8
Agoura Hills7
Oxnard7
Thousand Oaks7
Calabasas6
Camarillo6
San Bernardino6
Santa Monica6

Names as recorded by the utilities

The utilities recorded this installer under 6 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
SOUTH WEST SOLAR INC326
SOUTH WEST SOLAR25
South West Solar Inc12
SOUTH WEST SOLAR, INC6
South West Solar4
south west solar Inc1

Common questions

Where does SOUTH WEST SOLAR INC install solar?

Its installs are spread across 17 counties. The most are in Los Angeles County (200 installs), followed by Orange County (43).

How often does SOUTH WEST SOLAR INC install batteries with solar?

1.9% of its interconnected solar installs include battery storage across all years, and 100.0% in the last 24 months (1 of 1). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many SOUTH WEST SOLAR INC installs are under NEM 3.0 (the Net Billing Tariff)?

2 of its 374 interconnected installs (0.5% of the 374 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 100.0% of those on PG&E and SCE records include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.