Sun Kiss Solar

How many solar installs has Sun Kiss Solar done in California, and which license number is on its installs?

Sun Kiss Solar has 136 residential solar installs interconnected in California, active in the records from 2011 through 2026 (Aug 3, 2011 to May 8, 2026), most of them in Fresno County (54), San Joaquin County (36) and El Dorado County (16). CSLB lists license 947207 (sole owner license, name not shown) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, C-46, expires Oct 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
136
Last 24 months
4
Total capacity
753.5 kW DC
Median system size
5.1 kW DC
With battery storage
0.0% all time; 0.0% last 24 months
Third-party owned
0.0% of 136 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
6 installs, latest Oct 9, 2024
Ownership types recorded
none recorded
First install
Aug 3, 2011
Latest install
May 8, 2026
Counties
12
Utilities
PGE 133, SCE 3
CSLB license
947207

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2011 to 2026

YearInstalls interconnectedWith battery storage
201110
201200
201300
201410
201590
201680
2017560
201820
201930
2020170
202140
2022100
2023140
202480
202510
2026 (through Aug 31, 2026)20

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

6 of its 136 interconnected installs (4.4% of the 136 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 0.0% of those include battery storage. The latest Net Billing Tariff install was approved Oct 9, 2024.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.01914.0%not counted
NEM 2.011181.6%0 (0.0%)
Net Billing Tariff64.4%0 (0.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Sun Kiss Solar’s installs. No residential system in the file lists a third-party owner name that matches Sun Kiss Solar exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 4 of Sun Kiss Solar’s 4 installs name a module maker in the “Generator Manufacturer” fields, and most of those (4, 100.0%) used modules recorded as Qcells.

In the last 24 months, 4 of Sun Kiss Solar’s 4 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (3, 75.0%) used inverters recorded as SMA.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells455
Inverter makerSMA348
Tigo Energy, Inc14

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 136 of 136 installs, inverters on 136. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
947207Sole owner license (name not shown)CLEARC-10 Electrical Contractor; C-46 Solar ContractorMay 12, 2010Oct 31, 2027135

License numbers are the ones the utilities recorded on the interconnection applications (135 of 136 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 947207. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Other names reported under the same license

Counties

CountyInstalls
Fresno54
San Joaquin36
El Dorado16
Calaveras11
Amador5
Kings3
Placer3
Lake2
Stanislaus2
Tulare2
Contra Costa1
Madera1

Top cities

CityInstalls
San Joaquin52
Stockton13
Acampo6
El Dorado Hills5
Lodi5
Tracy5
Burson3
Linden3
Loomis3
Placerville3
Armona2
Cameron Park2
Fresno2
Grizzly Flats2
Jackson2

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Sun Kiss Solar76
SUN KISS SOLAR60

Common questions

Where does Sun Kiss Solar install solar?

Its installs are spread across 12 counties. The most are in Fresno County (54 installs), followed by San Joaquin County (36).

How often does Sun Kiss Solar install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years, and 0.0% in the last 24 months (0 of 4).

How many Sun Kiss Solar installs are under NEM 3.0 (the Net Billing Tariff)?

6 of its 136 interconnected installs (4.4% of the 136 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 0.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.