How many solar installs has Sunkiss Solar done in California, and which license number is on its installs?

Sunkiss Solar has 171 residential solar installs interconnected in California, active in the records from 2009 through 2021 (Mar 17, 2009 to Jun 1, 2021), most of them in San Joaquin County (95), Calaveras County (27) and El Dorado County (9). CSLB lists license 947207 (sole owner license, name not shown) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, C-46, expires Oct 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
171
Last 24 months
0
Total capacity
1,318.5 kW DC
Median system size
7.3 kW DC
With battery storage
0.0% all time; no installs in the last 24 months last 24 months
Third-party owned
0.0% of 167 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
none recorded
First install
Mar 17, 2009
Latest install
Jun 1, 2021
Counties
17
Utilities
PGE 167, SCE 4
CSLB license
947207

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2009 to 2026

YearInstalls interconnectedWith battery storage
200960
201080
201170
201240
201350
2014170
2015190
2016210
2017280
2018350
2019200
202000
202110
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 171 interconnected installs with a tariff recorded (171) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.08750.9%not counted
NEM 2.08449.1%0 (0.0%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Sunkiss Solar’s installs. No residential system in the file lists a third-party owner name that matches Sunkiss Solar exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 167 of Sunkiss Solar’s 171 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (79, 47.3%) used modules recorded as Qcells.

Across all years, 171 of Sunkiss Solar’s 171 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (75, 43.9%) used inverters recorded as SolarEdge.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells079
SolarWorld023
Canadian Solar019
REC014
BP Solar012
Inverter makerSolarEdge075
SMA044
Enphase032
Fronius018
APsystems (Altenergy Power System)02

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 167 of 171 installs, inverters on 171. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
947207Sole owner license (name not shown)CLEARC-10 Electrical Contractor; C-46 Solar ContractorMay 12, 2010Oct 31, 2027126

License numbers are the ones the utilities recorded on the interconnection applications (127 of 171 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 947207. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Other names reported under the same license

Counties

CountyInstalls
San Joaquin95
Calaveras27
El Dorado9
Fresno7
Amador6
Stanislaus6
Madera4
Placer3
Alameda2
Contra Costa2
Kings2
Sacramento2
Tulare2
Mariposa1
San Mateo1
Tuolumne1
Yolo1

Top cities

CityInstalls
Stockton45
Acampo17
Valley Springs16
Manteca11
Lodi10
Wallace5
Cameron Park4
Ione4
Linden4
Oakhurst4
Burson3
El Dorado Hills3
Escalon3
Oakdale3
Riverbank3

Names as recorded by the utilities

The utilities recorded this installer under 5 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Sunkiss Solar156
SunKiss Solar7
sunkiss solar3
Sunkiss solar3
SUNKISS SOLAR2

Common questions

Where does Sunkiss Solar install solar?

Its installs are spread across 17 counties. The most are in San Joaquin County (95 installs), followed by Calaveras County (27).

How often does Sunkiss Solar install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years.

How many Sunkiss Solar installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 171 interconnected installs with a tariff recorded (171) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.