SUNKISS SOLAR CONSTRUCTION INC

How many solar installs has SUNKISS SOLAR CONSTRUCTION INC done in California, and which license number is on its installs?

SUNKISS SOLAR CONSTRUCTION INC has 71 residential solar installs interconnected in California, active in the records from 2021 through 2022 (Jul 17, 2021 to Sep 1, 2022), most of them in San Joaquin County (19), Stanislaus County (18) and Tuolumne County (17). The license number recorded on most of its installs, 1076177, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
71
Last 24 months
0
Total capacity
691.1 kW DC
Median system size
8.7 kW DC
With battery storage
0.0% all time; no installs in the last 24 months last 24 months
Third-party owned
0.0% of 71 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
none recorded
First install
Jul 17, 2021
Latest install
Sep 1, 2022
Counties
10
Utilities
PGE 71
CSLB license
1076177

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2021 to 2026

YearInstalls interconnectedWith battery storage
2021390
2022320
202300
202400
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 71 interconnected installs with a tariff recorded (71) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.071100.0%0 (0.0%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on SUNKISS SOLAR CONSTRUCTION INC’s installs. No residential system in the file lists a third-party owner name that matches SUNKISS SOLAR CONSTRUCTION INC exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 63 of SUNKISS SOLAR CONSTRUCTION INC’s 71 installs name a module maker in the “Generator Manufacturer” fields, and most of those (63, 100.0%) used modules recorded as Qcells.

Across all years, 71 of SUNKISS SOLAR CONSTRUCTION INC’s 71 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (70, 98.6%) used inverters recorded as SMA.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells063
Inverter makerSMA070
Power-One02
SolarEdge02
ABB01
Enphase01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 63 of 71 installs, inverters on 71. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1076177Not found in the CSLB License Master file pulled Nov 4, 202671

License numbers are the ones the utilities recorded on the interconnection applications (71 of 71 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Counties

CountyInstalls
San Joaquin19
Stanislaus18
Tuolumne17
Calaveras6
Merced4
Amador2
Yolo2
Alameda1
Kern1
Placer1

Top cities

CityInstalls
Oakdale14
Sonora9
Tracy5
Manteca4
Stockton4
Valley Springs3
Acampo2
Ione2
La Grange2
Merced2
Ripon2
Riverbank2
Twain Harte2
West Sacramento2
Angels Camp1

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
SUNKISS SOLAR CONSTRUCTION INC71

Common questions

Where does SUNKISS SOLAR CONSTRUCTION INC install solar?

Its installs are spread across 10 counties. The most are in San Joaquin County (19 installs), followed by Stanislaus County (18).

How often does SUNKISS SOLAR CONSTRUCTION INC install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years.

How many SUNKISS SOLAR CONSTRUCTION INC installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 71 interconnected installs with a tariff recorded (71) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.