Sunsolar US Inc
How many solar installs has Sunsolar US Inc done in California, and which license number is on its installs?
Sunsolar US Inc has 85 residential solar installs interconnected in California, active in the records from 2013 through 2017 (Dec 23, 2013 to Jul 5, 2017), most of them in Orange County (40), Los Angeles County (20) and Riverside County (17). CSLB lists license 975072 (AAA SUN BUILDERS) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, expires Jul 31, 2028.
License status changes daily. Confirm it on CSLB’s own license check before relying on it.
- Interconnected installs
- 85
- Last 24 months
- 0
- Total capacity
- 613.5 kW DC
- Median system size
- 6.7 kW DC
- With battery storage
- 0.0% all time; no installs in the last 24 months last 24 months
- Third-party owned
- 4.2% of 71 installs where ownership was reported
- Net Billing Tariff (NEM 3.0)
- 0 installs
- Ownership types recorded
- lease 3
- First install
- Dec 23, 2013
- Latest install
- Jul 5, 2017
- Counties
- 6
- Utilities
- SCE 84, PGE 1
- CSLB license
- 975072
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installs by year, 2013 to 2026
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2013 | 1 | 0 |
| 2014 | 8 | 0 |
| 2015 | 19 | 0 |
| 2016 | 35 | 0 |
| 2017 | 22 | 0 |
| 2018 | 0 | 0 |
| 2019 | 0 | 0 |
| 2020 | 0 | 0 |
| 2021 | 0 | 0 |
| 2022 | 0 | 0 |
| 2023 | 0 | 0 |
| 2024 | 0 | 0 |
| 2025 | 0 | 0 |
| 2026 (through Aug 31, 2026) | 0 | 0 |
Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)
None of its 85 interconnected installs with a tariff recorded (85) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.
| Tariff recorded by the utility | Installs | Share of installs with a tariff | With battery storage |
|---|---|---|---|
| NEM 1.0 | 85 | 100.0% | not counted |
| NEM 2.0 | 0 | 0.0% | 0 |
| Net Billing Tariff | 0 | 0.0% | 0 |
The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.
Leases, PPAs and third-party owners
On 3 of Sunsolar US Inc’s installs the utility recorded a third-party ownership type: PPA 0, lease 3, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches Sunsolar US Inc exactly.
| Third-party owner named on its installs | Installs |
|---|---|
| SunPower | 2 |
| Sun Power Capital llc | 1 |
Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.
Equipment recorded
Across all years, 68 of Sunsolar US Inc’s 85 installs name a module maker in the “Generator Manufacturer” fields, and most of those (45, 66.2%) used modules recorded as Mitsubishi Electric.
Across all years, 85 of Sunsolar US Inc’s 85 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (80, 94.1%) used inverters recorded as SolarEdge.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | Mitsubishi Electric | 0 | 45 |
| LG | 0 | 10 | |
| Canadian Solar | 0 | 5 | |
| SunPower | 0 | 5 | |
| REC | 0 | 2 | |
| Inverter maker | SolarEdge | 0 | 80 |
| SunPower | 0 | 5 |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 68 of 85 installs, inverters on 85. See the methodology and the equipment index.
SGIP battery storage projects
The SGIP report names Sunsolar US Inc as developer on 21 battery storage projects and as installer on 28 (20 name it as both), 29 projects in all with 340 kWh of storage. 25 have the status Paid, with $52,860 in current incentive allocations. Applications were received from Oct 1, 2019 to Dec 30, 2025.
By status
| Status as published | Projects | Storage kWh | Current incentive |
|---|---|---|---|
| Paid | 25 | 292 | $52,860 |
| Reserved | 3 | 38 | $5,460 |
| Cancelled | 1 | 10 | $1,440 |
By budget category
| Budget category | Projects | Storage kWh | Current incentive | Paid projects | Paid: current incentive |
|---|---|---|---|---|---|
| Small Residential Storage | 29 | 340 | $59,760 | 25 | $52,860 |
Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.
A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.
Contractor license
| License | CSLB business name | CSLB status, file pulled Nov 4, 2026 | Classifications | Issued | Expires | Installs reported |
|---|---|---|---|---|---|---|
| 975072 | AAA SUN BUILDERS (Corporation) | CLEAR | B General Building Contractor; C-10 Electrical Contractor | Jul 19, 2012 | Jul 31, 2028 | 45 |
License numbers are the ones the utilities recorded on the interconnection applications (50 of 85 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.
Disciplinary bonds and pending actions in the License Master file
The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 975072. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.
Local solar permits naming its license
Solar permits in city and county open data that list Sunsolar US Inc’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.
| Permit data | License | 2020 | 2022 | Total |
|---|---|---|---|---|
| unincorporated San Diego County | 975072 | 1 | 1 | 2 |
Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.
Other names reported under the same license
- SUNSOLAR U S INC: 208 installs, license 975072
- AAA SUN BUILDERS: 135 installs, license 975072
Counties
| County | Installs |
|---|---|
| Orange | 40 |
| Los Angeles | 20 |
| Riverside | 17 |
| San Bernardino | 5 |
| Tulare | 2 |
| Kern | 1 |
Top cities
| City | Installs |
|---|---|
| Irvine | 8 |
| Corona | 6 |
| Long Beach | 5 |
| Huntington Beach | 4 |
| Mission Viejo | 3 |
| Norco | 3 |
| Orange | 3 |
| Yorba Linda | 3 |
| Lake Elsinore | 2 |
| Lake Forest | 2 |
| Palm Desert | 2 |
| Placentia | 2 |
| San Bernardino | 2 |
| Santa Ana | 2 |
| Temecula | 2 |
Names as recorded by the utilities
The utilities recorded this installer under 5 spellings. See the methodology for how spellings are combined.
| Installer name as recorded | Installs |
|---|---|
| Sunsolar US Inc | 58 |
| SunSolar US | 12 |
| SunSolar US Inc | 7 |
| SUNSOLAR US INC. | 7 |
| SunSolar US Inc. | 1 |
Common questions
Where does Sunsolar US Inc install solar?
Its installs are spread across 6 counties. The most are in Orange County (40 installs), followed by Los Angeles County (20).
How often does Sunsolar US Inc install batteries with solar?
0.0% of its interconnected solar installs include battery storage across all years.
How many Sunsolar US Inc installs are under NEM 3.0 (the Net Billing Tariff)?
None of its 85 interconnected installs with a tariff recorded (85) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
- Self-Generation Incentive Program (SGIP) program administrators: Real-Time Public Report of SGIP applications (selfgenca.com)
Records last pulled Nov 16, 2026. Every entry links to the original public record.