SUNSOLAR U S INC

How many solar installs has SUNSOLAR U S INC done in California, and which license number is on its installs?

SUNSOLAR U S INC has 208 residential solar installs interconnected in California, active in the records from 2013 through 2023 (Jul 9, 2013 to Apr 28, 2023), most of them in San Diego County (87), Orange County (82) and San Bernardino County (14). CSLB lists license 975072 (AAA SUN BUILDERS) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, expires Jul 31, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
208
Last 24 months
0
Total capacity
1,471.1 kW DC
Median system size
6.4 kW DC
With battery storage
8.5% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; no installs in the last 24 months last 24 months
Third-party owned
0.0% of 206 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
none recorded
Median battery size
9.8 kWh (8 installs list a capacity)
First install
Jul 9, 2013
Latest install
Apr 28, 2023
Counties
6
Utilities
SDGE 114, SCE 94
CSLB license
975072

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2013 to 2026

YearInstalls interconnectedWith battery storage
201330
201420
2015130
2016250
2017330
2018381
2019330
2020334
2021163
2022100
202320
202400
202500
2026 (through Aug 31, 2026)00

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 208 interconnected installs with a tariff recorded (208) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.03416.3%not counted
NEM 2.017483.7%8 (8.9%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on SUNSOLAR U S INC’s installs. No residential system in the file lists a third-party owner name that matches SUNSOLAR U S INC exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 198 of SUNSOLAR U S INC’s 208 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (85, 42.9%) used modules recorded as LG.

Across all years, 208 of SUNSOLAR U S INC’s 208 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (202, 97.1%) used inverters recorded as SolarEdge.

Across all years, 8 of SUNSOLAR U S INC’s 208 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (8, 100.0%) used batteries recorded as LG.

8 of 8 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerLG085
Mitsubishi Electric035
Qcells017
Silfab017
Panasonic014
Inverter makerSolarEdge0202
Enphase02
SunPower02
ABB01
Tesla01
Battery makerLG08

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 198 of 208 installs, inverters on 208. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names SUNSOLAR U S INC as developer on 0 battery storage projects and as installer on 9 (0 name it as both), 9 projects in all with 111 kWh of storage. 3 have the status Paid, with $20,090 in current incentive allocations. Applications were received from Jul 3, 2024 to Dec 30, 2025.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid338$20,090
Reserved554$8,019
RRF Rejected119$2,881

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage773$10,9002$2,881
Equity Resiliency119$17,2091$17,209
Not stated119$2,8810$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
975072AAA SUN BUILDERS (Corporation)CLEARB General Building Contractor; C-10 Electrical ContractorJul 19, 2012Jul 31, 2028181

License numbers are the ones the utilities recorded on the interconnection applications (183 of 208 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 975072. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list SUNSOLAR U S INC’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense20202022Total
unincorporated San Diego County975072112

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
San Diego87
Orange82
San Bernardino14
Los Angeles13
Riverside11
Tulare1

Top cities

CityInstalls
San Diego33
Laguna Hills15
Irvine9
Ladera Ranch9
Mission Viejo8
San Clemente8
Laguna Niguel7
Garden Grove5
Oceanside5
Vista5
Yorba Linda5
Huntington Beach4
Lake Forest4
Santa Ana4
Tustin4

Names as recorded by the utilities

The utilities recorded this installer under 5 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
SUNSOLAR U S INC203
SUNSOLAR U S2
SUNSOLAR U S dba AAA Sun Builders1
SunSolar U S Inc, dba AAA Sun Builders1
SunSolar U.S1

Common questions

Where does SUNSOLAR U S INC install solar?

Its installs are spread across 6 counties. The most are in San Diego County (87 installs), followed by Orange County (82).

How often does SUNSOLAR U S INC install batteries with solar?

8.5% of its interconnected solar installs include battery storage across all years. Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many SUNSOLAR U S INC installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 208 interconnected installs with a tariff recorded (208) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.