SUNSTAR ENERGY INC
How many solar installs has SUNSTAR ENERGY INC done in California, and which license number is on its installs?
SUNSTAR ENERGY INC has 424 residential solar installs interconnected in California, active in the records from 2003 through 2026 (Oct 15, 2003 to Jul 6, 2026), most of them in Tulare County (92), Fresno County (73) and Santa Clara County (56). The license number recorded on most of its installs, 812746, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.
License status changes daily. Confirm it on CSLB’s own license check before relying on it.
- Interconnected installs
- 424
- Last 24 months
- 25
- Total capacity
- 2,685.9 kW DC
- Median system size
- 5.7 kW DC
- With battery storage
- 0.0% all time; 0.0% last 24 months
- Third-party owned
- 0.5% of 423 installs where ownership was reported
- Net Billing Tariff (NEM 3.0)
- 1 installs, latest Jul 6, 2026
- Ownership types recorded
- PPA 2
- First install
- Oct 15, 2003
- Latest install
- Jul 6, 2026
- Counties
- 19
- Utilities
- PGE 220, SCE 204
- CSLB license
- 812746
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installs by year, 2003 to 2026
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2003 | 6 | 0 |
| 2004 | 8 | 0 |
| 2005 | 7 | 0 |
| 2006 | 12 | 0 |
| 2007 | 14 | 0 |
| 2008 | 1 | 0 |
| 2009 | 3 | 0 |
| 2010 | 4 | 0 |
| 2011 | 5 | 0 |
| 2012 | 6 | 0 |
| 2013 | 8 | 0 |
| 2014 | 2 | 0 |
| 2015 | 5 | 0 |
| 2016 | 8 | 0 |
| 2017 | 3 | 0 |
| 2018 | 2 | 0 |
| 2019 | 2 | 0 |
| 2020 | 5 | 0 |
| 2021 | 0 | 0 |
| 2022 | 58 | 0 |
| 2023 | 203 | 0 |
| 2024 | 49 | 0 |
| 2025 | 10 | 0 |
| 2026 (through Aug 31, 2026) | 3 | 0 |
Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)
1 of its 424 interconnected installs (0.2% of the 424 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 0.0% of those include battery storage. The latest Net Billing Tariff install was approved Jul 6, 2026.
| Tariff recorded by the utility | Installs | Share of installs with a tariff | With battery storage |
|---|---|---|---|
| NEM 1.0 | 89 | 21.0% | not counted |
| NEM 2.0 | 334 | 78.8% | 0 (0.0%) |
| Net Billing Tariff | 1 | 0.2% | 0 (0.0%) |
The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.
Leases, PPAs and third-party owners
On 2 of SUNSTAR ENERGY INC’s installs the utility recorded a third-party ownership type: PPA 2, lease 0, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches SUNSTAR ENERGY INC exactly.
| Third-party owner named on its installs | Installs |
|---|---|
| BrightOak | 1 |
| Solwerks | 1 |
Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.
Equipment recorded
In the last 24 months, 25 of SUNSTAR ENERGY INC’s 25 installs name a module maker in the “Generator Manufacturer” fields, and most of those (17, 68.0%) used modules recorded as JinkoSolar.
In the last 24 months, 25 of SUNSTAR ENERGY INC’s 25 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (13, 52.0%) used inverters recorded as Hoymiles.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | JinkoSolar | 17 | 261 |
| Phono Solar Technology | 7 | 25 | |
| Hoymiles | 1 | not in top list | |
| Inverter maker | Hoymiles | 13 | 40 |
| Enphase | 10 | 195 | |
| SolarEdge | 2 | 98 |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 392 of 424 installs, inverters on 424. See the methodology and the equipment index.
Contractor license
| License | CSLB business name | CSLB status, file pulled Nov 4, 2026 | Classifications | Issued | Expires | Installs reported |
|---|---|---|---|---|---|---|
| 812746 | Not found in the CSLB License Master file pulled Nov 4, 2026 | 350 | ||||
License numbers are the ones the utilities recorded on the interconnection applications (350 of 424 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.
Counties
| County | Installs |
|---|---|
| Tulare | 92 |
| Fresno | 73 |
| Santa Clara | 56 |
| San Bernardino | 50 |
| Kings | 45 |
| Kern | 28 |
| Santa Cruz | 20 |
| Riverside | 18 |
| Madera | 12 |
| Alameda | 7 |
| Los Angeles | 6 |
| Merced | 4 |
| San Mateo | 4 |
| Contra Costa | 3 |
| Orange | 2 |
| Mariposa | 1 |
| San Francisco | 1 |
| San Joaquin | 1 |
| Solano | 1 |
Top cities
| City | Installs |
|---|---|
| Hanford | 39 |
| Visalia | 32 |
| Fresno | 29 |
| Los Gatos | 29 |
| Victorville | 19 |
| Tulare | 16 |
| Adelanto | 15 |
| Porterville | 15 |
| Dinuba | 12 |
| San Jose | 12 |
| Madera | 11 |
| Delano | 10 |
| Sanger | 10 |
| Bakersfield | 8 |
| Campbell | 8 |
Names as recorded by the utilities
The utilities recorded this installer under 11 spellings. See the methodology for how spellings are combined.
| Installer name as recorded | Installs |
|---|---|
| SUNSTAR ENERGY INC | 330 |
| SunStar Energy, Inc | 29 |
| SunStar Energy, Inc. | 28 |
| Sunstar Energy, Inc. | 11 |
| Sunstar Energy | 6 |
| SunStar Energy Inc | 6 |
| Sunstar Energy, Inc | 6 |
| SunStar Energy | 5 |
| Sunstar Energy Inc | 1 |
| Sunstar Energy Inc. | 1 |
| SunStar Energy Inc. | 1 |
Common questions
Where does SUNSTAR ENERGY INC install solar?
Its installs are spread across 19 counties. The most are in Tulare County (92 installs), followed by Fresno County (73).
How often does SUNSTAR ENERGY INC install batteries with solar?
0.0% of its interconnected solar installs include battery storage across all years, and 0.0% in the last 24 months (0 of 25).
How many SUNSTAR ENERGY INC installs are under NEM 3.0 (the Net Billing Tariff)?
1 of its 424 interconnected installs (0.2% of the 424 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 0.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
Records last pulled Nov 16, 2026. Every entry links to the original public record.