Terry's Green Power Construction

How many solar installs has Terry's Green Power Construction done in California, and which license number is on its installs?

Terry's Green Power Construction has 74 residential solar installs interconnected in California, active in the records from 2019 through 2026 (May 9, 2019 to Aug 6, 2026), most of them in San Joaquin County (39), Merced County (7) and Tuolumne County (7). The license number recorded on most of its installs, 1051564, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
74
Last 24 months
1
Total capacity
539.8 kW DC
Median system size
6.7 kW DC
With battery storage
1.4% all time; 0.0% last 24 months
Third-party owned
0.0% of 74 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
2 installs, latest Aug 6, 2026
Ownership types recorded
none recorded
First install
May 9, 2019
Latest install
Aug 6, 2026
Counties
14
Utilities
PGE 74
CSLB license
1051564

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2019 to 2026

YearInstalls interconnectedWith battery storage
2019150
2020210
2021100
2022130
2023130
202411
202500
2026 (through Aug 31, 2026)10

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

2 of its 74 interconnected installs (2.7% of the 74 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 50.0% of those include battery storage. The latest Net Billing Tariff install was approved Aug 6, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.07297.3%0 (0.0%)
Net Billing Tariff22.7%1 (50.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Terry's Green Power Construction’s installs. No residential system in the file lists a third-party owner name that matches Terry's Green Power Construction exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 1 of Terry's Green Power Construction’s 1 installs name a module maker in the “Generator Manufacturer” fields, and most of those (1, 100.0%) used modules recorded as Qcells.

In the last 24 months, 1 of Terry's Green Power Construction’s 1 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (1, 100.0%) used inverters recorded as Enphase.

In the last 24 months, none of Terry's Green Power Construction’s 1 installs name a battery maker in the “Generator Manufacturer” fields; the fields are blank or unreadable on those records.

1 of 1 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells134
Inverter makerEnphase113
Battery makerAPsystems (Altenergy Power System)01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 71 of 74 installs, inverters on 74. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1051564Not found in the CSLB License Master file pulled Nov 4, 202674

License numbers are the ones the utilities recorded on the interconnection applications (74 of 74 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Counties

CountyInstalls
San Joaquin39
Merced7
Tuolumne7
Contra Costa6
Solano4
Alameda3
Amador1
Fresno1
San Francisco1
San Mateo1
Santa Clara1
Stanislaus1
Sutter1
Yolo1

Top cities

CityInstalls
Stockton33
Sonora4
Merced3
Tracy3
Atwater2
Fairfield2
Groveland2
Le Grand2
Richmond2
Vallejo2
Antioch1
Byron1
Jamestown1
Lodi1
Manteca1

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
TERRY'S GREEN POWER CONSTRUCTION65
Terry's Green Power Construction9

Common questions

Where does Terry's Green Power Construction install solar?

Its installs are spread across 14 counties. The most are in San Joaquin County (39 installs), followed by Merced County (7).

How often does Terry's Green Power Construction install batteries with solar?

1.4% of its interconnected solar installs include battery storage across all years, and 0.0% in the last 24 months (0 of 1).

How many Terry's Green Power Construction installs are under NEM 3.0 (the Net Billing Tariff)?

2 of its 74 interconnected installs (2.7% of the 74 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 50.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.