The Solar Quote

How many solar installs has The Solar Quote done in California, and which license number is on its installs?

The Solar Quote has 72 residential solar installs interconnected in California, active in the records from 2017 through 2019 (Mar 7, 2017 to Mar 27, 2019), most of them in San Joaquin County (34), Butte County (9) and Calaveras County (4). The license number recorded on most of its installs, 1018941, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
72
Last 24 months
0
Total capacity
588.1 kW DC
Median system size
7.6 kW DC
With battery storage
0.0% all time; no installs in the last 24 months last 24 months
Third-party owned
18.1% of 72 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
lease 13
First install
Mar 7, 2017
Latest install
Mar 27, 2019
Counties
14
Utilities
PGE 72
CSLB license
1018941

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2017 to 2026

YearInstalls interconnectedWith battery storage
2017510
2018190
201920
202000
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 72 interconnected installs with a tariff recorded (72) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.072100.0%0 (0.0%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 13 of The Solar Quote’s installs the utility recorded a third-party ownership type: PPA 0, lease 13, prepaid lease 0, other 0. Across all installers, 41 residential systems list a third-party owner name that matches The Solar Quote exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
The Solar Quote13

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 70 of The Solar Quote’s 72 installs name a module maker in the “Generator Manufacturer” fields, and most of those (70, 100.0%) used modules recorded as SunPower.

Across all years, 72 of The Solar Quote’s 72 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (72, 100.0%) used inverters recorded as SunPower.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSunPower070
Inverter makerSunPower072
SMA01
SolarEdge01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 70 of 72 installs, inverters on 72. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names The Solar Quote as developer on 1 battery storage project and as installer on 1 (1 name it as both), 1 projects in all with 24 kWh of storage. 0 have the status Paid, with $0 in current incentive allocations. Applications were received from Aug 8, 2023 to Aug 8, 2023.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Cancelled124$1,875

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Large-Scale Storage124$1,8750$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1018941Not found in the CSLB License Master file pulled Nov 4, 202671

License numbers are the ones the utilities recorded on the interconnection applications (72 of 72 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Counties

CountyInstalls
San Joaquin34
Butte9
Calaveras4
Santa Clara4
Tuolumne4
Alameda3
Amador3
Contra Costa2
Mariposa2
Nevada2
Stanislaus2
Placer1
Solano1
Yuba1

Top cities

CityInstalls
Tracy14
Oroville7
Manteca5
Stockton5
Ione3
Lathrop3
Linden3
San Jose3
Livermore2
Sonora2
Acampo1
Burson1
Chico1
Columbia1
Copperopolis1

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
The Solar Quote71
The solar Quote1

Common questions

Where does The Solar Quote install solar?

Its installs are spread across 14 counties. The most are in San Joaquin County (34 installs), followed by Butte County (9).

How often does The Solar Quote install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years.

How many The Solar Quote installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 72 interconnected installs with a tariff recorded (72) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.