Twinpeak Solar

How many solar installs has Twinpeak Solar done in California, and which license number is on its installs?

Twinpeak Solar has 124 residential solar installs interconnected in California, active in the records from 2022 through 2026 (Sep 27, 2022 to Aug 27, 2026), most of them in Solano County (31), Alameda County (22) and Contra Costa County (16). CSLB lists license 1092083 (TWINPEAK SOLAR) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires May 31, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
124
Last 24 months
77
Total capacity
1,142.3 kW DC
Median system size
8.6 kW DC
With battery storage
55.6% all time; 75.3% last 24 months
Third-party owned
6.5% of 124 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
70 installs, latest Aug 27, 2026
Ownership types recorded
PPA 2, prepaid lease 6
Median battery size
14 kWh (29 installs list a capacity)
First install
Sep 27, 2022
Latest install
Aug 27, 2026
Counties
12
Utilities
PGE 124
CSLB license
1092083

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2022 to 2026

YearInstalls interconnectedWith battery storage
202220
2023310
20241914
20254129
2026 (through Aug 31, 2026)3126

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

70 of its 124 interconnected installs (56.5% of the 124 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 88.6% of those include battery storage. The latest Net Billing Tariff install was approved Aug 27, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.064.8%not counted
NEM 2.04838.7%4 (8.3%)
Net Billing Tariff7056.5%62 (88.6%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 8 of Twinpeak Solar’s installs the utility recorded a third-party ownership type: PPA 2, lease 0, prepaid lease 6, other 0. Across all installers, 8 residential systems list a third-party owner name that matches Twinpeak Solar exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
Twinpeak Solar8

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 74 of Twinpeak Solar’s 77 installs name a module maker in the “Generator Manufacturer” fields, and most of those (52, 70.3%) used modules recorded as Qcells.

In the last 24 months, 77 of Twinpeak Solar’s 77 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (46, 59.7%) used inverters recorded as Enphase.

In the last 24 months, 47 of Twinpeak Solar’s 77 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (27, 57.4%) used batteries recorded as Enphase.

58 of 69 battery-paired PG&E and SCE installs (84.1%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells5292
Silfab1017
Mission Solar88
REC55
LONGi33
Inverter makerEnphase4675
Tesla3131
SolarEdge624
ABB22
APsystems (Altenergy Power System)22
Battery makerEnphase2738
Tesla2020
LG11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 121 of 124 installs, inverters on 124. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1092083TWINPEAK SOLAR (Corporation)CLEARC-10 Electrical ContractorMay 27, 2022May 31, 2028124

License numbers are the ones the utilities recorded on the interconnection applications (124 of 124 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1092083. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Solano31
Alameda22
Contra Costa16
Santa Clara15
Fresno12
San Joaquin10
Sutter7
Madera4
Kern3
Napa2
Butte1
Merced1

Top cities

CityInstalls
Fairfield20
San Jose11
Yuba City7
Danville6
Suisun City6
Fremont5
Fresno5
Tracy5
Hayward4
Stockton4
Union City4
Antioch3
Bakersfield3
Chowchilla3
Clovis3

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
TWINPEAK SOLAR109
Twinpeak Solar15

Common questions

Where does Twinpeak Solar install solar?

Its installs are spread across 12 counties. The most are in Solano County (31 installs), followed by Alameda County (22).

How often does Twinpeak Solar install batteries with solar?

55.6% of its interconnected solar installs include battery storage across all years, and 75.3% in the last 24 months (58 of 77).

How many Twinpeak Solar installs are under NEM 3.0 (the Net Billing Tariff)?

70 of its 124 interconnected installs (56.5% of the 124 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 88.6% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.