UNDERLINE CONCEPTS INC

How many solar installs has UNDERLINE CONCEPTS INC done in California, and which license number is on its installs?

UNDERLINE CONCEPTS INC has 107 residential solar installs interconnected in California, active in the records from 2016 through 2021 (Jul 14, 2016 to Feb 16, 2021), most of them in Riverside County (72), San Bernardino County (16) and Los Angeles County (10). CSLB lists license 1015714 (UNDERLINE ENERGY CONCEPTS) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, C-20, C-39, expires Jul 31, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
107
Last 24 months
0
Total capacity
920.2 kW DC
Median system size
8.6 kW DC
With battery storage
2.8% all time; no installs in the last 24 months last 24 months
Third-party owned
4.7% of 107 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
PPA 1, lease 4
Median battery size
9.8 kWh (3 installs list a capacity)
First install
Jul 14, 2016
Latest install
Feb 16, 2021
Counties
4
Utilities
SCE 107
CSLB license
1015714

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2016 to 2026

YearInstalls interconnectedWith battery storage
201650
201730
201800
201970
2020883
202140
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 107 interconnected installs with a tariff recorded (107) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.065.6%not counted
NEM 2.010194.4%3 (3.0%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 5 of UNDERLINE CONCEPTS INC’s installs the utility recorded a third-party ownership type: PPA 1, lease 4, prepaid lease 0, other 0. Across all installers, 3 residential systems list a third-party owner name that matches UNDERLINE CONCEPTS INC exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
sunrun2
hdcap1
sunle1
sunlender1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 107 of UNDERLINE CONCEPTS INC’s 107 installs name a module maker in the “Generator Manufacturer” fields, and most of those (83, 77.6%) used modules recorded as Silfab.

Across all years, 107 of UNDERLINE CONCEPTS INC’s 107 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (97, 90.7%) used inverters recorded as SolarEdge.

Across all years, 3 of UNDERLINE CONCEPTS INC’s 107 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (3, 100.0%) used batteries recorded as LG.

3 of 3 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSilfab083
LG016
Canadian Solar03
Axitec01
Hyundai01
Inverter makerSolarEdge097
Enphase08
SunPower02
Battery makerLG03

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 107 of 107 installs, inverters on 107. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names UNDERLINE CONCEPTS INC as developer on 0 battery storage projects and as installer on 2 (0 name it as both), 2 projects in all with 20 kWh of storage. 2 have the status Paid, with $9,249 in current incentive allocations. Applications were received from Jan 13, 2022 to Oct 25, 2022.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid220$9,249

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Equity Resiliency17$6,4701$6,470
Small Residential Storage114$2,7791$2,779

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1015714UNDERLINE ENERGY CONCEPTS (Corporation)CLEARB General Building Contractor; C-10 Electrical Contractor; C-20 Warm-Air Heating, Ventilating and Air-Conditioning Contractor; C-39 Roofing ContractorJul 1, 2016Jul 31, 2028106

License numbers are the ones the utilities recorded on the interconnection applications (107 of 107 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1015714. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list UNDERLINE CONCEPTS INC’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense201820192020202120222023202420252026Total
unincorporated San Diego County1015714121612172315311100

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
Riverside72
San Bernardino16
Los Angeles10
Orange9

Top cities

CityInstalls
Canyon Lake28
Murrieta7
Temecula6
Lake Elsinore5
Corona4
Moreno Valley4
Menifee3
Sun City3
Fontana2
Hemet2
Loma Linda2
Rancho Cucamonga2
Aguanga1
Aliso Viejo1
Apple Valley1

Names as recorded by the utilities

The utilities recorded this installer under 3 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
UNDERLINE CONCEPTS INC99
underline concepts6
UNDERLINE CONCEPTS2

Common questions

Where does UNDERLINE CONCEPTS INC install solar?

Its installs are spread across 4 counties. The most are in Riverside County (72 installs), followed by San Bernardino County (16).

How often does UNDERLINE CONCEPTS INC install batteries with solar?

2.8% of its interconnected solar installs include battery storage across all years.

How many UNDERLINE CONCEPTS INC installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 107 interconnected installs with a tariff recorded (107) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.