UNDERLINE ENERGY CONCEPTS

How many solar installs has UNDERLINE ENERGY CONCEPTS done in California, and which license number is on its installs?

UNDERLINE ENERGY CONCEPTS has 926 residential solar installs interconnected in California, active in the records from 2016 through 2026 (Oct 4, 2016 to Aug 26, 2026), most of them in Riverside County (609), San Bernardino County (112) and Los Angeles County (94). CSLB lists license 1015714 (UNDERLINE ENERGY CONCEPTS) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, C-20, C-39, expires Jul 31, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
926
Last 24 months
102
Total capacity
9,530.5 kW DC
Median system size
9.7 kW DC
With battery storage
18.4% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 85.7% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
1.8% of 926 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
125 installs, latest Aug 26, 2026
Ownership types recorded
PPA 2, lease 8, prepaid lease 7
Median battery size
13.5 kWh (169 installs list a capacity)
First install
Oct 4, 2016
Latest install
Aug 26, 2026
Counties
16
Utilities
SCE 910, PGE 12, SDGE 4
CSLB license
1015714

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2016 to 2026

YearInstalls interconnectedWith battery storage
2016120
2017510
2018510
2019551
202041
2021984
202219820
202328934
20249046
20254539
2026 (through Aug 31, 2026)3325

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

125 of its 926 interconnected installs (13.5% of the 926 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 92.6% of those on PG&E and SCE records include battery storage. The latest Net Billing Tariff install was approved Aug 26, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.0454.9%not counted
NEM 2.075681.6%58 (7.7%)
Net Billing Tariff12513.5%112 (92.6%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 17 of UNDERLINE ENERGY CONCEPTS’s installs the utility recorded a third-party ownership type: PPA 2, lease 8, prepaid lease 7, other 0. No residential system in the file lists a third-party owner name that matches UNDERLINE ENERGY CONCEPTS exactly.

Third-party owner named on its installsInstalls
sunrun4
uec3
ENFIN2
hdcap2
hdmcap1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 101 of UNDERLINE ENERGY CONCEPTS’ 102 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (49, 48.5%) used modules recorded as Silfab.

In the last 24 months, 102 of UNDERLINE ENERGY CONCEPTS’ 102 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (73, 71.6%) used inverters recorded as SolarEdge.

In the last 24 months, 84 of UNDERLINE ENERGY CONCEPTS’ 102 installs name a battery maker in the “Generator Manufacturer” fields, and the most common maker (31, 36.9%) used batteries recorded as LG.

159 of 170 battery-paired PG&E and SCE installs (93.5%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSilfab49551
Aptos Solar2228
VSUN (Vietnam Sunergy)8not in top list
Qcells7129
JinkoSolar6not in top list
Inverter makerSolarEdge73511
Enphase17294
Tesla1535
ABB1not in top list
Battery makerLG3164
SolarEdge2653
Tesla1414
Enphase621
SolarEdg33

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 901 of 926 installs, inverters on 926. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names UNDERLINE ENERGY CONCEPTS as developer on 2 battery storage projects and as installer on 52 (1 name it as both), 53 projects in all with 717 kWh of storage. 43 have the status Paid, with $70,684 in current incentive allocations. Applications were received from Apr 20, 2018 to Jul 22, 2024.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid43468$70,684
Cancelled10249$68,052

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage51548$82,63043$70,684
Equity Resiliency110$9,7060$0
Large-Scale Storage1160$46,4000$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1015714UNDERLINE ENERGY CONCEPTS (Corporation)CLEARB General Building Contractor; C-10 Electrical Contractor; C-20 Warm-Air Heating, Ventilating and Air-Conditioning Contractor; C-39 Roofing ContractorJul 1, 2016Jul 31, 2028923

License numbers are the ones the utilities recorded on the interconnection applications (926 of 926 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1015714. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list UNDERLINE ENERGY CONCEPTS’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense201820192020202120222023202420252026Total
unincorporated San Diego County1015714121612172315311100

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
Riverside609
San Bernardino112
Los Angeles94
Orange74
Ventura19
San Diego4
Fresno3
Contra Costa2
Kern2
Butte1
El Dorado1
Humboldt1
Napa1
Santa Barbara1
Santa Clara1
Solano1

Top cities

CityInstalls
Canyon Lake258
Murrieta68
Lake Elsinore35
Menifee33
Temecula31
Corona29
Moreno Valley26
Hemet16
Fontana14
Perris14
Redlands13
Wildomar12
Norco11
Sun City11
Winchester11

Names as recorded by the utilities

The utilities recorded this installer under 3 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
UNDERLINE ENERGY CONCEPTS542
underline energy concepts337
Underline Energy Concepts47

Common questions

Where does UNDERLINE ENERGY CONCEPTS install solar?

Its installs are spread across 16 counties. The most are in Riverside County (609 installs), followed by San Bernardino County (112).

How often does UNDERLINE ENERGY CONCEPTS install batteries with solar?

18.4% of its interconnected solar installs include battery storage across all years, and 85.7% in the last 24 months (84 of 98). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many UNDERLINE ENERGY CONCEPTS installs are under NEM 3.0 (the Net Billing Tariff)?

125 of its 926 interconnected installs (13.5% of the 926 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 92.6% of those on PG&E and SCE records include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.