UNITED ELECTRIC
How many solar installs has UNITED ELECTRIC done in California, and which license number is on its installs?
UNITED ELECTRIC has 84 residential solar installs interconnected in California, active in the records from 2012 through 2026 (Jun 29, 2012 to Aug 28, 2026), most of them in Ventura County (56), San Joaquin County (13) and Los Angeles County (5). CSLB lists license 378462 (UNITED ELECTRIC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, expires Dec 31, 2027.
License status changes daily. Confirm it on CSLB’s own license check before relying on it.
The installs credited to UNITED ELECTRIC here carry more than one CSLB license number: 378462 on 63 (CSLB holder UNITED ELECTRIC, Camarillo) and 1033745 on 21 (CSLB holder Sole owner license (name not shown)), in the License Master file pulled Nov 4, 2026. They are grouped under one installer by the name written on the applications; the records do not say whether these numbers belong to the same legal entity.
- Interconnected installs
- 84
- Last 24 months
- 14
- Total capacity
- 644.9 kW DC
- Median system size
- 7.1 kW DC
- With battery storage
- 24.1% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 21.4% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
- Third-party owned
- 0.0% of 84 installs where ownership was reported
- Net Billing Tariff (NEM 3.0)
- 14 installs, latest Aug 28, 2026
- Ownership types recorded
- none recorded
- Median battery size
- 17.5 kWh (20 installs list a capacity)
- First install
- Jun 29, 2012
- Latest install
- Aug 28, 2026
- Counties
- 9
- Utilities
- SCE 62, PGE 21, SDGE 1
- CSLB license
- 378462, 1033745
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installs by year, 2012 to 2026
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2012 | 1 | 0 |
| 2013 | 0 | 0 |
| 2014 | 1 | 0 |
| 2015 | 0 | 0 |
| 2016 | 1 | 0 |
| 2017 | 2 | 1 |
| 2018 | 0 | 0 |
| 2019 | 0 | 0 |
| 2020 | 0 | 0 |
| 2021 | 36 | 10 |
| 2022 | 15 | 3 |
| 2023 | 9 | 3 |
| 2024 | 5 | 0 |
| 2025 | 11 | 3 |
| 2026 (through Aug 31, 2026) | 3 | 0 |
The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.
Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)
14 of its 84 interconnected installs (16.7% of the 84 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 21.4% of those include battery storage. The latest Net Billing Tariff install was approved Aug 28, 2026.
| Tariff recorded by the utility | Installs | Share of installs with a tariff | With battery storage |
|---|---|---|---|
| NEM 1.0 | 5 | 6.0% | not counted |
| NEM 2.0 | 65 | 77.4% | 16 (25.0%) |
| Net Billing Tariff | 14 | 16.7% | 3 (21.4%) |
The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.
Leases, PPAs and third-party owners
The utilities recorded no third-party ownership type (PPA or lease) on UNITED ELECTRIC’s installs. No residential system in the file lists a third-party owner name that matches UNITED ELECTRIC exactly.
Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.
Equipment recorded
In the last 24 months, 14 of UNITED ELECTRIC’s 14 installs name a module maker in the “Generator Manufacturer” fields, and most of those (11, 78.6%) used modules recorded as Mission Solar.
In the last 24 months, 14 of UNITED ELECTRIC’s 14 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (12, 85.7%) used inverters recorded as Enphase.
In the last 24 months, 3 of UNITED ELECTRIC’s 14 installs name a battery maker in the “Generator Manufacturer” fields, and the most common maker (1, 33.3%) used batteries recorded as FranklinWH.
12 of 20 battery-paired PG&E and SCE installs (60.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | Mission Solar | 11 | 18 |
| Silfab | 2 | 12 | |
| Canadian Solar | 1 | not in top list | |
| Qcells | 1 | 28 | |
| Inverter maker | Enphase | 12 | 56 |
| SolarEdge | 2 | 18 | |
| ABB | 1 | not in top list | |
| Battery maker | FranklinWH | 1 | 1 |
| LG | 1 | 7 | |
| Tesla | 1 | not in top list |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 80 of 84 installs, inverters on 84. See the methodology and the equipment index.
SGIP battery storage projects
The SGIP report names UNITED ELECTRIC as developer on 0 battery storage projects and as installer on 2 (0 name it as both), 2 projects in all with 21 kWh of storage. 1 have the status Paid, with $2,602 in current incentive allocations. Applications were received from Jun 4, 2020 to Oct 12, 2020.
By status
| Status as published | Projects | Storage kWh | Current incentive |
|---|---|---|---|
| Paid | 1 | 17 | $2,602 |
| Cancelled | 1 | 4 | $960 |
By budget category
| Budget category | Projects | Storage kWh | Current incentive | Paid projects | Paid: current incentive |
|---|---|---|---|---|---|
| Small Residential Storage | 2 | 21 | $3,562 | 1 | $2,602 |
Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.
A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.
Contractor license
| License | CSLB business name | CSLB status, file pulled Nov 4, 2026 | Classifications | Issued | Expires | Installs reported |
|---|---|---|---|---|---|---|
| 378462 | UNITED ELECTRIC (Corporation) | CLEAR | B General Building Contractor; C-10 Electrical Contractor | Jul 6, 1979 | Dec 31, 2027 | 63 |
| 1033745 | Sole owner license (name not shown) | CLEAR | C-10 Electrical Contractor | Dec 7, 2017 | Dec 31, 2027 | 21 |
License numbers are the ones the utilities recorded on the interconnection applications (84 of 84 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.
Disciplinary bonds and pending actions in the License Master file
The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for licenses 378462, 1033745. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.
Counties
| County | Installs |
|---|---|
| Ventura | 56 |
| San Joaquin | 13 |
| Los Angeles | 5 |
| Stanislaus | 3 |
| Merced | 2 |
| Sonoma | 2 |
| Lake | 1 |
| San Diego | 1 |
| Santa Barbara | 1 |
Top cities
| City | Installs |
|---|---|
| Ventura | 17 |
| Thousand Oaks | 12 |
| Camarillo | 11 |
| Stockton | 5 |
| Lathrop | 4 |
| Manteca | 4 |
| Ojai | 4 |
| Santa Paula | 4 |
| Riverbank | 3 |
| Los Banos | 2 |
| Oak Park | 2 |
| Simi Valley | 2 |
| Agoura Hills | 1 |
| Altadena | 1 |
| Carpinteria | 1 |
Names as recorded by the utilities
The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.
| Installer name as recorded | Installs |
|---|---|
| UNITED ELECTRIC | 80 |
| United Electric | 4 |
Common questions
Where does UNITED ELECTRIC install solar?
Its installs are spread across 9 counties. The most are in Ventura County (56 installs), followed by San Joaquin County (13).
How often does UNITED ELECTRIC install batteries with solar?
24.1% of its interconnected solar installs include battery storage across all years, and 21.4% in the last 24 months (3 of 14). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.
How many UNITED ELECTRIC installs are under NEM 3.0 (the Net Billing Tariff)?
14 of its 84 interconnected installs (16.7% of the 84 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 21.4% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
- Self-Generation Incentive Program (SGIP) program administrators: Real-Time Public Report of SGIP applications (selfgenca.com)
Records last pulled Nov 16, 2026. Every entry links to the original public record.