VALLEY SOLAR SERVICE CORPORATION

How many solar installs has VALLEY SOLAR SERVICE CORPORATION done in California, and which license number is on its installs?

VALLEY SOLAR SERVICE CORPORATION has 127 residential solar installs interconnected in California, active in the records from 2022 through 2026 (May 25, 2022 to Jul 2, 2026), most of them in Fresno County (76), Tulare County (22) and Madera County (14). CSLB lists license 1081676 (VALLEY SOLAR SERVICE CORPORATION) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-46, expires Sep 30, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
127
Last 24 months
35
Total capacity
1,274.7 kW DC
Median system size
8.7 kW DC
With battery storage
0.0% all time; 0.0% last 24 months
Third-party owned
0.0% of 127 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
62 installs, latest Mar 16, 2026
Ownership types recorded
none recorded
First install
May 25, 2022
Latest install
Jul 2, 2026
Counties
7
Utilities
PGE 106, SCE 21
CSLB license
1081676

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2022 to 2026

YearInstalls interconnectedWith battery storage
2022160
2023560
2024300
2025200
2026 (through Aug 31, 2026)50

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

62 of its 127 interconnected installs (48.8% of the 127 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 0.0% of those include battery storage. The latest Net Billing Tariff install was approved Mar 16, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.06551.2%0 (0.0%)
Net Billing Tariff6248.8%0 (0.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on VALLEY SOLAR SERVICE CORPORATION’s installs. No residential system in the file lists a third-party owner name that matches VALLEY SOLAR SERVICE CORPORATION exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 34 of VALLEY SOLAR SERVICE CORPORATION’s 35 installs name a module maker in the “Generator Manufacturer” fields, and most of those (30, 88.2%) used modules recorded as JinkoSolar.

In the last 24 months, 35 of VALLEY SOLAR SERVICE CORPORATION’s 35 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (27, 77.1%) used inverters recorded as SolarEdge.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerJinkoSolar3089
Hyundai22
Qcells26
Inverter makerSolarEdge27102
Enphase518
SMA311
PV Powered11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 118 of 127 installs, inverters on 127. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names VALLEY SOLAR SERVICE CORPORATION as developer on 1 battery storage project and as installer on 1 (1 name it as both), 1 projects in all with 10 kWh of storage. 0 have the status Paid, with $0 in current incentive allocations. Applications were received from Apr 20, 2026 to Apr 20, 2026.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Pending Reservation110$25,457

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Residential Solar and Storage Equity - AB 209 Non-POU110$25,4570$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1081676VALLEY SOLAR SERVICE CORPORATION (Corporation)CLEARC-46 Solar ContractorSep 24, 2021Sep 30, 2027127

License numbers are the ones the utilities recorded on the interconnection applications (127 of 127 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1081676. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Fresno76
Tulare22
Madera14
Kern6
Kings4
Merced4
Shasta1

Top cities

CityInstalls
Fresno34
Madera12
Parlier8
Selma7
Visalia7
Mendota6
Reedley5
Tulare5
Bakersfield3
Clovis3
Lemoore3
Porterville3
Sanger3
Del Rey2
Dinuba2

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
VALLEY SOLAR SERVICE CORPORATION127

Common questions

Where does VALLEY SOLAR SERVICE CORPORATION install solar?

Its installs are spread across 7 counties. The most are in Fresno County (76 installs), followed by Tulare County (22).

How often does VALLEY SOLAR SERVICE CORPORATION install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years, and 0.0% in the last 24 months (0 of 35).

How many VALLEY SOLAR SERVICE CORPORATION installs are under NEM 3.0 (the Net Billing Tariff)?

62 of its 127 interconnected installs (48.8% of the 127 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 0.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.