Verza Solar Design

How many solar installs has Verza Solar Design done in California, and which license number is on its installs?

Verza Solar Design has 106 residential solar installs interconnected in California, active in the records from 2015 through 2026 (Nov 12, 2015 to Mar 11, 2026), most of them in San Diego County (102) and Orange County (4). CSLB lists license 1022014 (VERZA SOLAR ELECTRIC DESIGN) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Dec 31, 2026.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

The installs credited to Verza Solar Design here carry more than one CSLB license number: 1022014 on 60 (CSLB holder VERZA SOLAR ELECTRIC DESIGN, San Jacinto) and 895763 on 23 (not found in the CSLB License Master file), in the License Master file pulled Nov 4, 2026. They are grouped under one installer by the name written on the applications; the records do not say whether these numbers belong to the same legal entity.

Interconnected installs
106
Last 24 months
4
Total capacity
699.5 kW DC
Median system size
6 kW DC
With battery storage
not recorded (SDG&E files batteries as separate projects, not on the solar record) all time; not recorded (SDG&E files batteries as separate projects, not on the solar record) last 24 months
Third-party owned
0.0% of 106 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
4 installs, latest Mar 11, 2026
Ownership types recorded
none recorded
First install
Nov 12, 2015
Latest install
Mar 11, 2026
Counties
2
Utilities
SDGE 106
CSLB license
1022014, 895763

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2015 to 2026

YearInstalls interconnectedWith battery storage
201520
2016260
201750
2018120
2019190
202050
2021100
2022220
202310
202400
202530
2026 (through Aug 31, 2026)10

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

4 of its 106 interconnected installs (3.8% of the 106 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and battery storage is not recorded on those SDG&E solar records. The latest Net Billing Tariff install was approved Mar 11, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.02018.9%not counted
NEM 2.08277.4%not recorded
Net Billing Tariff43.8%not recorded

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Verza Solar Design’s installs. No residential system in the file lists a third-party owner name that matches Verza Solar Design exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 4 of Verza Solar Design’s 4 installs name a module maker in the “Generator Manufacturer” fields, and most of those (4, 100.0%) used modules recorded as Qcells.

In the last 24 months, 4 of Verza Solar Design’s 4 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (4, 100.0%) used inverters recorded as Enphase.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells458
Inverter makerEnphase498

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 106 of 106 installs, inverters on 106. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1022014VERZA SOLAR ELECTRIC DESIGN (Corporation)CLEARC-10 Electrical ContractorDec 22, 2016Dec 31, 202660
895763Not found in the CSLB License Master file pulled Nov 4, 202623

License numbers are the ones the utilities recorded on the interconnection applications (97 of 106 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1022014. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list Verza Solar Design’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense2018201920202021202220232025Total
unincorporated San Diego County1022014531231116

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
San Diego102
Orange4

Top cities

CityInstalls
San Diego30
El Cajon17
Encinitas9
Lakeside8
La Mesa6
Chula Vista4
Ramona4
La Jolla3
Oceanside3
Vista3
Cardiff2
Lemon Grove2
National City2
Poway2
Solana Beach2

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Verza Solar Design106

Common questions

Where does Verza Solar Design install solar?

Its installs are spread across 2 counties. The most are in San Diego County (102 installs), followed by Orange County (4).

How often does Verza Solar Design install batteries with solar?

Battery storage is not recorded on its interconnected solar installs: SDG&E files a battery as its own project record, not on the solar record.

How many Verza Solar Design installs are under NEM 3.0 (the Net Billing Tariff)?

4 of its 106 interconnected installs (3.8% of the 106 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and battery storage is not recorded on those SDG&E solar records. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.