VOLT MODERN ROOFING AND SOLAR

How many solar installs has VOLT MODERN ROOFING AND SOLAR done in California, and which license number is on its installs?

VOLT MODERN ROOFING AND SOLAR has 37 residential solar installs interconnected in California, active in the records from 2024 through 2026 (Aug 5, 2024 to Jun 4, 2026), most of them in Placer County (14), Yolo County (9) and Butte County (3). CSLB lists license 1042043 (VOLT MODERN ROOFING AND SOLAR) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-39, C-46, expires Jul 31, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
37
Last 24 months
36
Total capacity
303.9 kW DC
Median system size
8 kW DC
With battery storage
64.9% all time; 63.9% last 24 months
Third-party owned
2.7% of 37 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
34 installs, latest Jun 4, 2026
Ownership types recorded
PPA 1
Median battery size
30 kWh (1 installs list a capacity)
First install
Aug 5, 2024
Latest install
Jun 4, 2026
Counties
9
Utilities
PGE 37
CSLB license
1042043

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2024 to 2026

YearInstalls interconnectedWith battery storage
202443
20252618
2026 (through Aug 31, 2026)73

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

34 of its 37 interconnected installs (91.9% of the 37 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 70.6% of those include battery storage. The latest Net Billing Tariff install was approved Jun 4, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.025.4%not counted
NEM 2.012.7%0 (0.0%)
Net Billing Tariff3491.9%24 (70.6%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 1 of VOLT MODERN ROOFING AND SOLAR’s installs the utility recorded a third-party ownership type: PPA 1, lease 0, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches VOLT MODERN ROOFING AND SOLAR exactly.

Third-party owner named on its installsInstalls
Axia Solar Corp.1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 33 of VOLT MODERN ROOFING AND SOLAR’s 36 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (15, 45.5%) used modules recorded as Mission Solar.

In the last 24 months, 36 of VOLT MODERN ROOFING AND SOLAR’s 36 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (30, 83.3%) used inverters recorded as Enphase.

In the last 24 months, 21 of VOLT MODERN ROOFING AND SOLAR’s 36 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (17, 81.0%) used batteries recorded as Enphase.

21 of 24 battery-paired PG&E and SCE installs (87.5%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerMission Solar1515
Qcells1112
LONGi33
REC22
Silfab22
Inverter makerEnphase3031
Tesla55
SunPower22
ABB11
Fronius11
Battery makerEnphase1718
Tesla44

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 34 of 37 installs, inverters on 37. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1042043VOLT MODERN ROOFING AND SOLAR (Corporation)CLEARC-39 Roofing Contractor; C-46 Solar ContractorJul 19, 2018Jul 31, 202837

License numbers are the ones the utilities recorded on the interconnection applications (37 of 37 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1042043. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Other names reported under the same license

Counties

CountyInstalls
Placer14
Yolo9
Butte3
Sutter3
Yuba3
Nevada2
Contra Costa1
El Dorado1
San Joaquin1

Top cities

CityInstalls
Davis5
Lincoln5
Rocklin5
Chico3
Granite Bay3
Yuba City3
West Sacramento2
Woodland2
Galt1
Grass Valley1
Loma Rica1
Loomis1
Martinez1
Olivehurst1
Penn Valley1

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
VOLT MODERN ROOFING AND SOLAR37

Common questions

Where does VOLT MODERN ROOFING AND SOLAR install solar?

Its installs are spread across 9 counties. The most are in Placer County (14 installs), followed by Yolo County (9).

How often does VOLT MODERN ROOFING AND SOLAR install batteries with solar?

64.9% of its interconnected solar installs include battery storage across all years, and 63.9% in the last 24 months (23 of 36).

How many VOLT MODERN ROOFING AND SOLAR installs are under NEM 3.0 (the Net Billing Tariff)?

34 of its 37 interconnected installs (91.9% of the 37 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 70.6% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.