We Build San Diego

How many solar installs has We Build San Diego done in California, and which license number is on its installs?

We Build San Diego has 208 residential solar installs interconnected in California, active in the records from 2016 through 2026 (Nov 18, 2016 to Mar 27, 2026), most of them in San Diego County (201) and Orange County (7). CSLB lists license 939592 (SOLHOME) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, C-20, expires Mar 31, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
208
Last 24 months
26
Total capacity
1,467.6 kW DC
Median system size
6.2 kW DC
With battery storage
not recorded (SDG&E files batteries as separate projects, not on the solar record) all time; not recorded (SDG&E files batteries as separate projects, not on the solar record) last 24 months
Third-party owned
0.0% of 208 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
33 installs, latest Dec 18, 2025
Ownership types recorded
none recorded
First install
Nov 18, 2016
Latest install
Mar 27, 2026
Counties
2
Utilities
SDGE 208
CSLB license
939592

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2016 to 2026

YearInstalls interconnectedWith battery storage
201620
201790
2018120
2019170
202080
2021140
2022440
2023640
2024210
2025160
2026 (through Aug 31, 2026)10

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

33 of its 208 interconnected installs (15.9% of the 208 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and battery storage is not recorded on those SDG&E solar records. The latest Net Billing Tariff install was approved Dec 18, 2025.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.017584.1%not recorded
Net Billing Tariff3315.9%not recorded

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on We Build San Diego’s installs. No residential system in the file lists a third-party owner name that matches We Build San Diego exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 16 of We Build San Diego’s 26 installs name a module maker in the “Generator Manufacturer” fields, and most of those (16, 100.0%) used modules recorded as VietnamSunergyJointStockCompany.

In the last 24 months, 26 of We Build San Diego’s 26 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (20, 76.9%) used inverters recorded as Tesla.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerVietnamSunergyJointStockCompany1690
Inverter makerTesla2021
Enphase5180
SolarEdge35
SMA27
ABB13

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 174 of 208 installs, inverters on 208. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names We Build San Diego as developer on 0 battery storage projects and as installer on 6 (0 name it as both), 6 projects in all with 107 kWh of storage. 6 have the status Paid, with $15,208 in current incentive allocations. Applications were received from Aug 3, 2020 to Jan 13, 2022.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid6107$15,208

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage6107$15,2086$15,208

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
939592SOLHOME (Corporation)CLEARB General Building Contractor; C-10 Electrical Contractor; C-20 Warm-Air Heating, Ventilating and Air-Conditioning ContractorOct 29, 2009Mar 31, 2028208

License numbers are the ones the utilities recorded on the interconnection applications (208 of 208 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 939592. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list We Build San Diego’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense201820192020202120222023202420252026Total
unincorporated San Diego County9395921325141711111074

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
San Diego201
Orange7

Top cities

CityInstalls
San Diego74
Escondido27
San Marcos14
Oceanside11
Coronado10
Chula Vista7
Vista7
Bonita5
El Cajon5
La Mesa5
Ramona5
La Jolla4
Lakeside4
Encinitas3
Fallbrook3

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
We Build San Diego208

Common questions

Where does We Build San Diego install solar?

Its installs are spread across 2 counties. The most are in San Diego County (201 installs), followed by Orange County (7).

How often does We Build San Diego install batteries with solar?

Battery storage is not recorded on its interconnected solar installs: SDG&E files a battery as its own project record, not on the solar record.

How many We Build San Diego installs are under NEM 3.0 (the Net Billing Tariff)?

33 of its 208 interconnected installs (15.9% of the 208 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and battery storage is not recorded on those SDG&E solar records. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.