We Care Plumbing, Heating Air and Solar

How many solar installs has We Care Plumbing, Heating Air and Solar done in California, and which license number is on its installs?

We Care Plumbing, Heating Air and Solar has 53 residential solar installs interconnected in California, active in the records from 2016 through 2017 (Jan 5, 2016 to Aug 18, 2017), most of them in Riverside County (34), Los Angeles County (11) and San Bernardino County (5). CSLB lists license 779604 (WE CARE) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-20, C-36, expires Jun 30, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
53
Last 24 months
0
Total capacity
337.5 kW DC
Median system size
5.9 kW DC
With battery storage
0.0% all time; no installs in the last 24 months last 24 months
Third-party owned
0.0% of 53 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
none recorded
First install
Jan 5, 2016
Latest install
Aug 18, 2017
Counties
4
Utilities
SCE 53
CSLB license
779604

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2016 to 2026

YearInstalls interconnectedWith battery storage
2016360
2017170
201800
201900
202000
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 53 interconnected installs with a tariff recorded (53) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.05094.3%not counted
NEM 2.035.7%0 (0.0%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on We Care Plumbing, Heating Air and Solar’s installs. No residential system in the file lists a third-party owner name that matches We Care Plumbing, Heating Air and Solar exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 53 of We Care Plumbing, Heating Air and Solar’s 53 installs name a module maker in the “Generator Manufacturer” fields, and most of those (27, 50.9%) used modules recorded as SolarWorld.

Across all years, 53 of We Care Plumbing, Heating Air and Solar’s 53 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (53, 100.0%) used inverters recorded as SolarEdge.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSolarWorld027
Hyundai012
Panasonic07
PEIMAR06
Canadian Solar01
Inverter makerSolarEdge053

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 53 of 53 installs, inverters on 53. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
779604WE CARE (Corporation)CLEARB General Building Contractor; C-20 Warm-Air Heating, Ventilating and Air-Conditioning Contractor; C-36May 26, 2000Jun 30, 202853

License numbers are the ones the utilities recorded on the interconnection applications (53 of 53 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 779604. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Riverside34
Los Angeles11
San Bernardino5
Orange3

Top cities

CityInstalls
Murrieta9
Temecula7
Corona5
Hemet3
Lake Elsinore3
Highland2
La Habra2
La Mirada2
Menifee2
Rowland Heights2
Whittier2
Chino Hills1
Covina1
Diamond Bar1
Downey1

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
We Care Plumbing, Heating Air and Solar50
We Care Plumbing, Heating, Air and Solar3

Common questions

Where does We Care Plumbing, Heating Air and Solar install solar?

Its installs are spread across 4 counties. The most are in Riverside County (34 installs), followed by Los Angeles County (11).

How often does We Care Plumbing, Heating Air and Solar install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years.

How many We Care Plumbing, Heating Air and Solar installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 53 interconnected installs with a tariff recorded (53) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.