Your Power

How many solar installs has Your Power done in California, and which license number is on its installs?

Your Power has 118 residential solar installs interconnected in California, active in the records from 2017 through 2026 (Dec 26, 2017 to Jun 11, 2026), most of them in San Diego County (112), Orange County (3) and Riverside County (3). CSLB lists license 1028438 (YOUR POWER INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, expires Jun 30, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
118
Last 24 months
5
Total capacity
819.9 kW DC
Median system size
5.6 kW DC
With battery storage
0.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; not recorded (SDG&E files batteries as separate projects, not on the solar record) last 24 months
Third-party owned
0.8% of 118 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
5 installs, latest Jun 11, 2026
Ownership types recorded
PPA 1
First install
Dec 26, 2017
Latest install
Jun 11, 2026
Counties
3
Utilities
SDGE 115, SCE 3
CSLB license
1028438

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2017 to 2026

YearInstalls interconnectedWith battery storage
201710
2018170
2019170
2020140
2021130
2022140
2023310
202470
202530
2026 (through Aug 31, 2026)10

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

5 of its 118 interconnected installs (4.2% of the 118 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and battery storage is not recorded on those SDG&E solar records. The latest Net Billing Tariff install was approved Jun 11, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.011395.8%0 (0.0%)
Net Billing Tariff54.2%not recorded

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 1 of Your Power’s installs the utility recorded a third-party ownership type: PPA 1, lease 0, prepaid lease 0, other 0. Across all installers, 1 residential systems list a third-party owner name that matches Your Power exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
YOUR POWER INC.1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 5 of Your Power’s 5 installs name a module maker in the “Generator Manufacturer” fields, and most of those (3, 60.0%) used modules recorded as UnitedRenewableEnergyCo.,Ltd..

In the last 24 months, 5 of Your Power’s 5 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (5, 100.0%) used inverters recorded as Enphase.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerUnitedRenewableEnergyCo.,Ltd.33
JA Solar1not in top list
Qcells188
Inverter makerEnphase546

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 113 of 118 installs, inverters on 118. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Your Power as developer on 2 battery storage projects and as installer on 2 (1 name it as both), 3 projects in all with 53 kWh of storage. 2 have the status Paid, with $10,622 in current incentive allocations. Applications were received from Apr 24, 2018 to Sep 17, 2020.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid219$10,622
Cancelled133$7,516

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Equity Resiliency111$8,5231$8,523
Large-Scale Storage133$7,5160$0
Small Residential Storage18$2,0991$2,099

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1028438YOUR POWER INC (Corporation)CLEARB General Building Contractor; C-10 Electrical ContractorJun 28, 2017Jun 30, 2027118

License numbers are the ones the utilities recorded on the interconnection applications (118 of 118 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1028438. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list Your Power’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense201820202021202220232024Total
unincorporated San Diego County102843846478130

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
San Diego112
Orange3
Riverside3

Top cities

CityInstalls
San Diego52
Chula Vista11
El Cajon10
Spring Valley6
Vista6
Escondido4
La Mesa4
Lemon Grove4
Alpine3
Oceanside3
Poway2
Ramona2
Bonita1
Bonsall1
Calimesa1

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Your Power115
YOUR POWER INC3

Common questions

Where does Your Power install solar?

Its installs are spread across 3 counties. The most are in San Diego County (112 installs), followed by Orange County (3).

How often does Your Power install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years. Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Your Power installs are under NEM 3.0 (the Net Billing Tariff)?

5 of its 118 interconnected installs (4.2% of the 118 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and battery storage is not recorded on those SDG&E solar records. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.