Acro Energy Technologies, Inc.

How many solar installs has Acro Energy Technologies, Inc. done in California, and which license number is on its installs?

Acro Energy Technologies, Inc. has 212 residential solar installs interconnected in California, active in the records from 2009 through 2014 (Aug 11, 2009 to Jan 24, 2014), most of them in San Joaquin County (36), Stanislaus County (34) and Contra Costa County (21). The utilities did not record a CSLB license number on enough of these installs to look one up.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
212
Last 24 months
0
Total capacity
1,416.2 kW DC
Median system size
5.5 kW DC
With battery storage
0.0% all time; no installs in the last 24 months last 24 months
Third-party owned
0.9% of 212 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
PPA 1, other 1
First install
Aug 11, 2009
Latest install
Jan 24, 2014
Counties
28
Utilities
PGE 210, SCE 2
CSLB license
none reported

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2009 to 2026

YearInstalls interconnectedWith battery storage
200990
20101090
2011890
201240
201300
201410
201500
201600
201700
201800
201900
202000
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 212 interconnected installs with a tariff recorded (212) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.0212100.0%not counted
NEM 2.000.0%0
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 2 of Acro Energy Technologies, Inc.’s installs the utility recorded a third-party ownership type: PPA 1, lease 0, prepaid lease 0, other 1. No residential system in the file lists a third-party owner name that matches Acro Energy Technologies, Inc. exactly.

Third-party owner named on its installsInstalls
Sun Run Inc1
SunRun Inc.1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 210 of Acro Energy Technologies, Inc.’s 212 installs name a module maker in the “Generator Manufacturer” fields, and most of those (165, 78.6%) used modules recorded as Suntech.

Across all years, 212 of Acro Energy Technologies, Inc.’s 212 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (177, 83.5%) used inverters recorded as SMA.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSuntech0165
Sharp015
REC09
SunPower09
Canadian Solar05
Inverter makerSMA0177
Enphase012
Fronius011
SunPower08
Power-One03

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 210 of 212 installs, inverters on 212. See the methodology and the equipment index.

Contractor license

The utilities did not record a license number for enough of these installs to look one up.

License numbers are the ones the utilities recorded on the interconnection applications (2 of 212 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it.

Counties

CountyInstalls
San Joaquin36
Stanislaus34
Contra Costa21
Merced20
Calaveras14
Tuolumne14
Alameda11
Santa Clara10
Solano8
Fresno6
Marin4
Mariposa4
Madera3
Monterey3
San Francisco3
San Mateo3
Sonoma3
Kern2
Placer2
San Luis Obispo2
Tulare2
Amador1
El Dorado1
Kings1
Napa1
Nevada1
Sutter1
Yolo1

Top cities

CityInstalls
Oakdale32
Tracy10
Atwater9
Merced8
Stockton8
Livermore7
Manteca6
San Jose6
Brentwood5
Copperopolis5
Jamestown5
Byron4
Fresno4
Mariposa4
Sonora4

Names as recorded by the utilities

The utilities recorded this installer under 7 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Acro Energy Technologies, Inc.180
Acro Energy Technologies Inc12
Acro Energy Technologies, Inc7
Acro Energy Technologies6
Acro Energy Technologies, inc.3
ACRO Energy Technologies, Inc.3
Acro Energy Technologies Inc.1

Common questions

Where does Acro Energy Technologies, Inc. install solar?

Its installs are spread across 28 counties. The most are in San Joaquin County (36 installs), followed by Stanislaus County (34).

How often does Acro Energy Technologies, Inc. install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years.

How many Acro Energy Technologies, Inc. installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 212 interconnected installs with a tariff recorded (212) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.