American Solar Power Inc.

How many solar installs has American Solar Power Inc. done in California, and which license number is on its installs?

American Solar Power Inc. has 129 residential solar installs interconnected in California, active in the records from 2002 through 2026 (Jul 2, 2002 to Mar 19, 2026), most of them in Los Angeles County (70), Orange County (23) and San Bernardino County (17). CSLB lists license 941232 (AMERICAN SOLAR POWER INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, C-39, expires Dec 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
129
Last 24 months
2
Total capacity
981.9 kW DC
Median system size
6.4 kW DC
With battery storage
2.4% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 50.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
29.6% of 125 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
3 installs, latest Mar 19, 2026
Ownership types recorded
PPA 37
Median battery size
27 kWh (3 installs list a capacity)
First install
Jul 2, 2002
Latest install
Mar 19, 2026
Counties
9
Utilities
SCE 124, PGE 3, SDGE 2
CSLB license
941232

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2002 to 2026

YearInstalls interconnectedWith battery storage
200210
200300
200400
200500
200600
200700
200800
200900
201010
201100
201200
201300
201400
2015530
2016330
201780
201880
201931
202020
202160
202291
202320
202410
202511
2026 (through Aug 31, 2026)10

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

3 of its 129 interconnected installs (2.3% of the 129 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 0.0% of those include battery storage. The latest Net Billing Tariff install was approved Mar 19, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.09372.1%not counted
NEM 2.03325.6%3 (9.7%)
Net Billing Tariff32.3%0 (0.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 37 of American Solar Power Inc.’s installs the utility recorded a third-party ownership type: PPA 37, lease 0, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches American Solar Power Inc. exactly.

Third-party owner named on its installsInstalls
ORE Developer Corporate Entity27
OneRoof Energy9
TA Energy XXXVI LLC1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 2 of American Solar Power Inc.’s 2 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (1, 50.0%) used modules recorded as Qcells.

In the last 24 months, 2 of American Solar Power Inc.’s 2 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (2, 100.0%) used inverters recorded as Enphase.

In the last 24 months, 1 of American Solar Power Inc.’s 2 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (1, 100.0%) used batteries recorded as sonnen.

3 of 3 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells127
Solaria1not in top list
Inverter makerEnphase229
Battery makersonnen11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 120 of 129 installs, inverters on 128. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names American Solar Power Inc. as developer on 3 battery storage projects and as installer on 6 (3 name it as both), 6 projects in all with 477 kWh of storage. 3 have the status Paid, with $312,515 in current incentive allocations. Applications were received from May 1, 2017 to Nov 15, 2022.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid3380$312,515
PBI in Process162$51,104
Cancelled234$11,282

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Non-Residential Storage Equity3436$360,3142$309,209
Small Residential Storage341$14,5891$3,306

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
941232AMERICAN SOLAR POWER INC (Corporation)CLEARB General Building Contractor; C-10 Electrical Contractor; C-39 Roofing ContractorDec 21, 2009Dec 31, 2027114

License numbers are the ones the utilities recorded on the interconnection applications (116 of 129 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 941232. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Los Angeles70
Orange23
San Bernardino17
Ventura8
Riverside7
Alameda1
Colusa1
El Dorado1
San Diego1

Top cities

CityInstalls
Stevenson Ranch10
Fontana6
Orange5
Carson4
Cerritos4
Simi Valley4
Altadena3
Compton3
Irvine3
Long Beach3
Santa Monica3
Azusa2
Castaic2
Chino2
Corona2

Names as recorded by the utilities

The utilities recorded this installer under 11 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
American Solar Power Inc.42
American Solar Power29
AMERICAN SOLAR POWER INC27
American Solar Power Inc12
American Solar Power, Inc.8
american solar power4
American Solar Power, Inc3
AMERICAN SOLAR POWER1
American Solar Power Co.1
American Solar Power inc1
AMERICAN SOLAR POWER, INC1

Common questions

Where does American Solar Power Inc. install solar?

Its installs are spread across 9 counties. The most are in Los Angeles County (70 installs), followed by Orange County (23).

How often does American Solar Power Inc. install batteries with solar?

2.4% of its interconnected solar installs include battery storage across all years, and 50.0% in the last 24 months (1 of 2). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many American Solar Power Inc. installs are under NEM 3.0 (the Net Billing Tariff)?

3 of its 129 interconnected installs (2.3% of the 129 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 0.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.