AMERIGREEN BUILDERS INC
How many solar installs has AMERIGREEN BUILDERS INC done in California, and which license number is on its installs?
AMERIGREEN BUILDERS INC has 299 residential solar installs interconnected in California, active in the records from 2017 through 2026 (May 31, 2017 to Aug 25, 2026), most of them in Los Angeles County (202), Orange County (46) and Ventura County (27). CSLB lists license 1023006 (AMERIGREEN BUILDERS INC) with status Work Comp Susp in the License Master file pulled Nov 4, 2026, classifications B, expires Jan 31, 2027.
License status changes daily. Confirm it on CSLB’s own license check before relying on it.
- Interconnected installs
- 299
- Last 24 months
- 21
- Total capacity
- 2,555.4 kW DC
- Median system size
- 7.7 kW DC
- With battery storage
- 8.7% all time; 52.4% last 24 months
- Third-party owned
- 0.0% of 299 installs where ownership was reported
- Net Billing Tariff (NEM 3.0)
- 17 installs, latest Aug 25, 2026
- Ownership types recorded
- none recorded
- Median battery size
- 10.1 kWh (26 installs list a capacity)
- First install
- May 31, 2017
- Latest install
- Aug 25, 2026
- Counties
- 6
- Utilities
- SCE 298, PGE 1
- CSLB license
- 1023006
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installs by year, 2017 to 2026
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2017 | 6 | 0 |
| 2018 | 22 | 0 |
| 2019 | 38 | 1 |
| 2020 | 21 | 1 |
| 2021 | 38 | 2 |
| 2022 | 56 | 8 |
| 2023 | 80 | 3 |
| 2024 | 20 | 0 |
| 2025 | 6 | 3 |
| 2026 (through Aug 31, 2026) | 12 | 8 |
Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)
17 of its 299 interconnected installs (5.7% of the 299 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 58.8% of those include battery storage. The latest Net Billing Tariff install was approved Aug 25, 2026.
| Tariff recorded by the utility | Installs | Share of installs with a tariff | With battery storage |
|---|---|---|---|
| NEM 1.0 | 3 | 1.0% | not counted |
| NEM 2.0 | 279 | 93.3% | 16 (5.7%) |
| Net Billing Tariff | 17 | 5.7% | 10 (58.8%) |
The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.
Leases, PPAs and third-party owners
The utilities recorded no third-party ownership type (PPA or lease) on AMERIGREEN BUILDERS INC’s installs. No residential system in the file lists a third-party owner name that matches AMERIGREEN BUILDERS INC exactly.
Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.
Equipment recorded
In the last 24 months, 21 of AMERIGREEN BUILDERS INC’s 21 installs name a module maker in the “Generator Manufacturer” fields, and most of those (11, 52.4%) used modules recorded as Panasonic.
In the last 24 months, 21 of AMERIGREEN BUILDERS INC’s 21 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (19, 90.5%) used inverters recorded as Enphase.
In the last 24 months, 11 of AMERIGREEN BUILDERS INC’s 21 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (10, 90.9%) used batteries recorded as Enphase.
22 of 26 battery-paired PG&E and SCE installs (84.6%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | Panasonic | 11 | 152 |
| Hyundai | 8 | 44 | |
| JA Solar | 1 | not in top list | |
| Solaria | 1 | not in top list | |
| Inverter maker | Enphase | 19 | 99 |
| SolarEdge | 1 | 155 | |
| Tesla | 1 | 7 | |
| Battery maker | Enphase | 10 | 18 |
| Tesla | 1 | 3 |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 290 of 299 installs, inverters on 299. See the methodology and the equipment index.
SGIP battery storage projects
The SGIP report names AMERIGREEN BUILDERS INC as developer on 25 battery storage projects and as installer on 6 (6 name it as both), 25 projects in all with 342 kWh of storage. 16 have the status Paid, with $89,710 in current incentive allocations. Applications were received from Oct 10, 2019 to Jul 23, 2025.
By status
| Status as published | Projects | Storage kWh | Current incentive |
|---|---|---|---|
| Paid | 16 | 212 | $89,710 |
| Reserved | 2 | 23 | $15,593 |
| Cancelled | 7 | 107 | $34,821 |
By budget category
| Budget category | Projects | Storage kWh | Current incentive | Paid projects | Paid: current incentive |
|---|---|---|---|---|---|
| Small Residential Storage | 18 | 231 | $43,030 | 12 | $28,239 |
| Equity Resiliency | 6 | 95 | $94,784 | 4 | $61,471 |
| Large-Scale Storage | 1 | 16 | $2,310 | 0 | $0 |
Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.
A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.
Contractor license
| License | CSLB business name | CSLB status, file pulled Nov 4, 2026 | Classifications | Issued | Expires | Installs reported |
|---|---|---|---|---|---|---|
| 1023006 | AMERIGREEN BUILDERS INC (Corporation) | Work Comp Susp | B General Building Contractor | Jan 26, 2017 | Jan 31, 2027 | 299 |
License numbers are the ones the utilities recorded on the interconnection applications (299 of 299 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.
Disciplinary bonds and pending actions in the License Master file
The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1023006. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.
Counties
| County | Installs |
|---|---|
| Los Angeles | 202 |
| Orange | 46 |
| Ventura | 27 |
| San Bernardino | 17 |
| Riverside | 5 |
| Kern | 2 |
Top cities
| City | Installs |
|---|---|
| Long Beach | 17 |
| Culver City | 12 |
| Agoura Hills | 8 |
| Ontario | 8 |
| Thousand Oaks | 8 |
| Calabasas | 7 |
| Rancho Palos Verdes | 7 |
| San Gabriel | 7 |
| Santa Clarita | 7 |
| Simi Valley | 7 |
| Alhambra | 6 |
| Huntington Beach | 6 |
| Pasadena | 6 |
| Santa Monica | 6 |
| Westlake Village | 6 |
Names as recorded by the utilities
The utilities recorded this installer under 3 spellings. See the methodology for how spellings are combined.
| Installer name as recorded | Installs |
|---|---|
| AMERIGREEN BUILDERS INC | 295 |
| AmeriGreen Builders Inc | 2 |
| AmeriGreen Builders Inc. | 2 |
Common questions
Where does AMERIGREEN BUILDERS INC install solar?
Its installs are spread across 6 counties. The most are in Los Angeles County (202 installs), followed by Orange County (46).
How often does AMERIGREEN BUILDERS INC install batteries with solar?
8.7% of its interconnected solar installs include battery storage across all years, and 52.4% in the last 24 months (11 of 21).
How many AMERIGREEN BUILDERS INC installs are under NEM 3.0 (the Net Billing Tariff)?
17 of its 299 interconnected installs (5.7% of the 299 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 58.8% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
- Self-Generation Incentive Program (SGIP) program administrators: Real-Time Public Report of SGIP applications (selfgenca.com)
Records last pulled Nov 16, 2026. Every entry links to the original public record.