Barrier Solar Inc.

How many solar installs has Barrier Solar Inc. done in California, and which license number is on its installs?

Barrier Solar Inc. has 316 residential solar installs interconnected in California, active in the records from 2014 through 2026 (Jul 7, 2014 to Apr 15, 2026), most of them in Fresno County (267), Merced County (17) and Madera County (14). CSLB lists license 985005 (BARRIER SOLAR INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, expires Jul 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
316
Last 24 months
12
Total capacity
2,838.6 kW DC
Median system size
7.7 kW DC
With battery storage
1.6% all time; 41.7% last 24 months
Third-party owned
34.5% of 316 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
8 installs, latest Feb 26, 2026
Ownership types recorded
other 109
First install
Jul 7, 2014
Latest install
Apr 15, 2026
Counties
15
Utilities
PGE 315, SCE 1
CSLB license
985005

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2014 to 2026

YearInstalls interconnectedWith battery storage
201480
2015270
2016220
2017440
20181070
2019260
2020240
2021150
202270
2023200
202440
202572
2026 (through Aug 31, 2026)53

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

8 of its 316 interconnected installs (2.5% of the 316 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 62.5% of those include battery storage. The latest Net Billing Tariff install was approved Feb 26, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.06319.9%not counted
NEM 2.024577.5%0 (0.0%)
Net Billing Tariff82.5%5 (62.5%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 109 of Barrier Solar Inc.’s installs the utility recorded a third-party ownership type: PPA 0, lease 0, prepaid lease 0, other 109. Across all installers, 107 residential systems list a third-party owner name that matches Barrier Solar Inc. exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
Barrier Solar Inc107
B2

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 11 of Barrier Solar Inc.’s 12 installs name a module maker in the “Generator Manufacturer” fields, and most of those (7, 63.6%) used modules recorded as Canadian Solar.

In the last 24 months, 12 of Barrier Solar Inc.’s 12 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (6, 50.0%) used inverters recorded as Enphase.

In the last 24 months, 4 of Barrier Solar Inc.’s 12 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (3, 75.0%) used batteries recorded as Enphase.

4 of 5 battery-paired PG&E and SCE installs (80.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerCanadian Solar775
Phono Solar Technology2not in top list
Mitsubishi Electric1not in top list
SunPower18
Trina Solar114
Inverter makerEnphase6168
SMA346
SolarEdge2101
Yaskawa Solectria Solar22
Tesla1not in top list
Battery makerEnphase33
SolarEdge11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 314 of 316 installs, inverters on 316. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Barrier Solar Inc. as developer on 2 battery storage projects and as installer on 2 (2 name it as both), 2 projects in all with 1,529 kWh of storage. 0 have the status Paid, with $0 in current incentive allocations. Applications were received from Aug 30, 2022 to Apr 8, 2024.

By status

Status as publishedProjectsStorage kWhCurrent incentive
PBI in Process21,529$378,394

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Large-Scale Storage21,529$378,3940$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
985005BARRIER SOLAR INC (Corporation)CLEARB General Building Contractor; C-10 Electrical ContractorJul 3, 2013Jul 31, 2027316

License numbers are the ones the utilities recorded on the interconnection applications (316 of 316 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 985005. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Fresno267
Merced17
Madera14
Calaveras2
Monterey2
San Mateo2
Santa Cruz2
Sonoma2
Tulare2
Kings1
Napa1
Placer1
San Luis Obispo1
Santa Clara1
Tuolumne1

Top cities

CityInstalls
Fresno228
Clovis24
Madera13
Los Banos7
Dos Palos5
Kingsburg4
Del Rey3
Kerman3
Firebaugh2
Merced2
Santa Rosa2
Selma2
Valley Springs2
Arroyo Grande1
Atwater1

Names as recorded by the utilities

The utilities recorded this installer under 7 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Barrier Solar Inc.147
BARRIER SOLAR INC81
Barrier Solar28
Barrier Solar Inc28
Barrier Solar, Inc.25
Barrier Solar, Inc6
Barrier Solar, INC1

Common questions

Where does Barrier Solar Inc. install solar?

Its installs are spread across 15 counties. The most are in Fresno County (267 installs), followed by Merced County (17).

How often does Barrier Solar Inc. install batteries with solar?

1.6% of its interconnected solar installs include battery storage across all years, and 41.7% in the last 24 months (5 of 12).

How many Barrier Solar Inc. installs are under NEM 3.0 (the Net Billing Tariff)?

8 of its 316 interconnected installs (2.5% of the 316 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 62.5% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.