Built Green California Inc.

How many solar installs has Built Green California Inc. done in California, and which license number is on its installs?

Built Green California Inc. has 452 residential solar installs interconnected in California, active in the records from 2012 through 2019 (Apr 12, 2012 to Jul 11, 2019), most of them in San Diego County (420), Orange County (18) and Fresno County (7). The license number recorded on most of its installs, 955192, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
452
Last 24 months
0
Total capacity
2,989.8 kW DC
Median system size
5.9 kW DC
With battery storage
0.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; no installs in the last 24 months last 24 months
Third-party owned
7.6% of 211 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
lease 16
First install
Apr 12, 2012
Latest install
Jul 11, 2019
Counties
6
Utilities
SDGE 434, SCE 11, PGE 7
CSLB license
955192, 1020172, 1031710

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2012 to 2026

YearInstalls interconnectedWith battery storage
2012360
2013980
2014790
2015900
2016840
2017470
2018120
201960
202000
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 452 interconnected installs with a tariff recorded (452) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.036079.6%not counted
NEM 2.09220.4%not recorded
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 16 of Built Green California Inc.’s installs the utility recorded a third-party ownership type: PPA 0, lease 16, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches Built Green California Inc. exactly.

Third-party owner named on its installsInstalls
Built Green Ca13
Sunpower2
BuiltGreen Ca1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 435 of Built Green California Inc.’s 452 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (132, 30.3%) used modules recorded as SolarWorld.

Across all years, 448 of Built Green California Inc.’s 452 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (181, 40.4%) used inverters recorded as SolarEdge.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSolarWorld0132
LG088
Phono Solar Technology062
SunPower053
Canadian Solar050
Inverter makerSolarEdge0181
SMA0137
Power-One073
Enphase044
Fronius010

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 435 of 452 installs, inverters on 448. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
955192Not found in the CSLB License Master file pulled Nov 4, 202684
1020172Not found in the CSLB License Master file pulled Nov 4, 202631
1031710Not found in the CSLB License Master file pulled Nov 4, 202611

License numbers are the ones the utilities recorded on the interconnection applications (126 of 452 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Counties

CountyInstalls
San Diego420
Orange18
Fresno7
Los Angeles3
Riverside2
San Bernardino2

Top cities

CityInstalls
San Diego216
Escondido29
Chula Vista20
El Cajon19
Carlsbad18
La Mesa14
Ramona12
San Marcos12
Santee11
Vista11
Alpine8
Oceanside7
Poway7
Encinitas6
Fresno6

Names as recorded by the utilities

The utilities recorded this installer under 5 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Built Green California Inc.374
Built Green California, Inc69
BUILT GREEN CALIFORNIA INC5
Built Green California2
Built Green California Inc2

Common questions

Where does Built Green California Inc. install solar?

Its installs are spread across 6 counties. The most are in San Diego County (420 installs), followed by Orange County (18).

How often does Built Green California Inc. install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years. Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Built Green California Inc. installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 452 interconnected installs with a tariff recorded (452) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.