Bulldog Construction

How many solar installs has Bulldog Construction done in California, and which license number is on its installs?

Bulldog Construction has 124 residential solar installs interconnected in California, active in the records from 2017 through 2018 (Apr 13, 2017 to May 22, 2018), most of them in Placer County (46), Yolo County (13) and Contra Costa County (12). The license number recorded on most of its installs, 951358, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
124
Last 24 months
0
Total capacity
901.7 kW DC
Median system size
6.4 kW DC
With battery storage
0.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; no installs in the last 24 months last 24 months
Third-party owned
90.3% of 124 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
PPA 111, prepaid lease 1
First install
Apr 13, 2017
Latest install
May 22, 2018
Counties
16
Utilities
PGE 119, SCE 4, SDGE 1
CSLB license
951358, 51358

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2017 to 2026

YearInstalls interconnectedWith battery storage
20171110
2018130
201900
202000
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 124 interconnected installs with a tariff recorded (124) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.043.2%not counted
NEM 2.012096.8%0 (0.0%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 112 of Bulldog Construction’s installs the utility recorded a third-party ownership type: PPA 111, lease 0, prepaid lease 1, other 0. No residential system in the file lists a third-party owner name that matches Bulldog Construction exactly.

Third-party owner named on its installsInstalls
Sunrun102
Sun Run10

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 124 of Bulldog Construction’s 124 installs name a module maker in the “Generator Manufacturer” fields, and most of those (116, 93.5%) used modules recorded as Trina Solar.

Across all years, 124 of Bulldog Construction’s 124 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (119, 96.0%) used inverters recorded as SolarEdge.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerTrina Solar0116
LG04
Hyundai03
Canadian Solar01
Inverter makerSolarEdge0119
SMA04
Enphase01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 124 of 124 installs, inverters on 124. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
951358Not found in the CSLB License Master file pulled Nov 4, 2026110
51358Not found in the CSLB License Master file pulled Nov 4, 202613

License numbers are the ones the utilities recorded on the interconnection applications (124 of 124 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Counties

CountyInstalls
Placer46
Yolo13
Contra Costa12
Solano10
El Dorado8
San Joaquin8
Kern6
Stanislaus6
Amador4
Orange4
Fresno2
Napa1
San Diego1
San Luis Obispo1
Sutter1
Yuba1

Top cities

CityInstalls
Loomis23
Granite Bay9
Woodland8
Auburn7
Bakersfield6
Dixon6
Riverbank6
Stockton5
Concord4
El Dorado Hills4
Jackson3
Pittsburg3
Rocklin3
Vacaville3
Davis2

Names as recorded by the utilities

The utilities recorded this installer under 3 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Bulldog Construction118
Bulldog construction4
bulldog construction2

Common questions

Where does Bulldog Construction install solar?

Its installs are spread across 16 counties. The most are in Placer County (46 installs), followed by Yolo County (13).

How often does Bulldog Construction install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years. Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Bulldog Construction installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 124 interconnected installs with a tariff recorded (124) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.