Burtek Energy LLC

How many solar installs has Burtek Energy LLC done in California, and which license number is on its installs?

Burtek Energy LLC has 162 residential solar installs interconnected in California, active in the records from 2018 through 2026 (Jul 2, 2018 to Jul 25, 2026), most of them in San Diego County (152), Orange County (5) and Riverside County (3). CSLB lists license 1019515 (BURTEK ENERGY LLC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications A, B, C-10, C-20, C-46, expires Oct 31, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
162
Last 24 months
24
Total capacity
1,203.7 kW DC
Median system size
6.4 kW DC
With battery storage
33.3% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 100.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
12.3% of 162 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
25 installs, latest Jul 25, 2026
Ownership types recorded
PPA 4, lease 16
Median battery size
20.7 kWh (2 installs list a capacity)
First install
Jul 2, 2018
Latest install
Jul 25, 2026
Counties
5
Utilities
SDGE 156, SCE 4, PGE 2
CSLB license
1019515

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2018 to 2026

YearInstalls interconnectedWith battery storage
2018200
2019340
202080
202140
2022140
2023521
2024110
2025150
2026 (through Aug 31, 2026)41

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

25 of its 162 interconnected installs (15.4% of the 162 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 100.0% of those on PG&E and SCE records include battery storage. The latest Net Billing Tariff install was approved Jul 25, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.013784.6%1 (20.0%)
Net Billing Tariff2515.4%1 (100.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 20 of Burtek Energy LLC’s installs the utility recorded a third-party ownership type: PPA 4, lease 16, prepaid lease 0, other 0. Across all installers, 16 residential systems list a third-party owner name that matches Burtek Energy LLC exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
Burtek Energy LLC16
SunPower2
Burtek LLC1
Current Energy1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 23 of Burtek Energy LLC’s 24 installs name a module maker in the “Generator Manufacturer” fields, and most of those (13, 56.5%) used modules recorded as SunPower.

In the last 24 months, 24 of Burtek Energy LLC’s 24 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (11, 45.8%) used inverters recorded as Tesla.

In the last 24 months, 1 of Burtek Energy LLC’s 24 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (1, 100.0%) used batteries recorded as Tesla.

1 of 2 battery-paired PG&E and SCE installs (50.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSunPower1395
HDHYUNDAIENERGYSOLUTIONSCO.,LTD.33
Qcells36
Aptos Solar1not in top list
LONGi1not in top list
Inverter makerTesla1111
Enphase864
SunPower583
SolarEdge19
Battery makerTesla11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 139 of 162 installs, inverters on 162. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Burtek Energy LLC as developer on 68 battery storage projects and as installer on 68 (68 name it as both), 68 projects in all with 1,123 kWh of storage. 54 have the status Paid, with $137,239 in current incentive allocations. Applications were received from Mar 26, 2019 to Aug 11, 2025.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid54883$137,239
Reserved453$71,820
Cancelled10187$94,138

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage57934$133,80153$124,659
Residential Solar and Storage Equity - AB 2097106$129,9800$0
Equity Resiliency228$24,1301$12,580
Large-Scale Storage256$15,2860$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1019515BURTEK ENERGY LLC (Limited Liability)CLEARA General Engineering Contractor; B General Building Contractor; C-10 Electrical Contractor; C-20 Warm-Air Heating, Ventilating and Air-Conditioning Contractor; C-46 Solar ContractorOct 19, 2016Oct 31, 2028162

License numbers are the ones the utilities recorded on the interconnection applications (162 of 162 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1019515. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list Burtek Energy LLC’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense201820192020202120222023202420252026Total
unincorporated San Diego County101951514711712131258

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
San Diego152
Orange5
Riverside3
Butte1
Fresno1

Top cities

CityInstalls
San Diego56
Oceanside18
Escondido10
Vista8
Chula Vista7
La Jolla7
Cardiff5
Fallbrook5
La Mesa4
Poway4
San Marcos4
El Cajon3
National City3
Ramona3
Rancho Santa Fe3

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Burtek Energy LLC157
BURTEK ENERGY LLC5

Common questions

Where does Burtek Energy LLC install solar?

Its installs are spread across 5 counties. The most are in San Diego County (152 installs), followed by Orange County (5).

How often does Burtek Energy LLC install batteries with solar?

33.3% of its interconnected solar installs include battery storage across all years, and 100.0% in the last 24 months (1 of 1). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Burtek Energy LLC installs are under NEM 3.0 (the Net Billing Tariff)?

25 of its 162 interconnected installs (15.4% of the 162 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 100.0% of those on PG&E and SCE records include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.