CM Electric AV Automations Incorpor

How many solar installs has CM Electric AV Automations Incorpor done in California, and which license number is on its installs?

CM Electric AV Automations Incorpor has 462 residential solar installs interconnected in California, active in the records from 2014 through 2026 (Nov 12, 2014 to Jun 16, 2026), most of them in San Diego County (451) and Orange County (11). CSLB lists license 984420 (CM SOLAR ELECTRIC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Jun 30, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
462
Last 24 months
18
Total capacity
2,863.5 kW DC
Median system size
5.4 kW DC
With battery storage
not recorded (SDG&E files batteries as separate projects, not on the solar record) all time; not recorded (SDG&E files batteries as separate projects, not on the solar record) last 24 months
Third-party owned
5.9% of 455 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
17 installs, latest Jun 16, 2026
Ownership types recorded
PPA 15, lease 12
First install
Nov 12, 2014
Latest install
Jun 16, 2026
Counties
2
Utilities
SDGE 462
CSLB license
984420

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2014 to 2026

YearInstalls interconnectedWith battery storage
201430
2015350
2016930
2017530
2018410
2019400
2020370
2021300
2022520
2023520
2024120
2025120
2026 (through Aug 31, 2026)20

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

17 of its 462 interconnected installs (3.7% of the 461 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and battery storage is not recorded on those SDG&E solar records. The latest Net Billing Tariff install was approved Jun 16, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.010121.9%not counted
NEM 2.034374.4%not recorded
Net Billing Tariff173.7%not recorded
Not recorded1

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 27 of CM Electric AV Automations Incorpor’s installs the utility recorded a third-party ownership type: PPA 15, lease 12, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches CM Electric AV Automations Incorpor exactly.

Third-party owner named on its installsInstalls
Carlos Melendez23
solar velocity2
CM SOLAR ELECTRIC1
Velocity solar1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 16 of CM Electric AV Automations Incorpor’s 18 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (6, 37.5%) used modules recorded as Trina Solar.

In the last 24 months, 17 of CM Electric AV Automations Incorpor’s 18 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (15, 88.2%) used inverters recorded as Enphase.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerTrina Solar6not in top list
Mission Solar2not in top list
Qcells254
SunPower277
Waaree2not in top list
Inverter makerEnphase15132
Tesla2not in top list

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 435 of 462 installs, inverters on 461. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
984420CM SOLAR ELECTRIC (Corporation)CLEAR, WC Susp PendingC-10 Electrical ContractorJun 10, 2013Jun 30, 2027375

License numbers are the ones the utilities recorded on the interconnection applications (375 of 462 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 984420. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list CM Electric AV Automations Incorpor’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense2018201920202021202220232026Total
unincorporated San Diego County9844201110851617168

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
San Diego451
Orange11

Top cities

CityInstalls
San Diego167
Chula Vista120
El Cajon24
Bonita19
La Mesa15
Spring Valley13
Escondido11
Ramona10
Santee8
Alpine7
Del Mar7
La Jolla6
Oceanside6
Carlsbad5
Coronado5

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
CM Electric AV Automations Incorpor462

Common questions

Where does CM Electric AV Automations Incorpor install solar?

Its installs are spread across 2 counties. The most are in San Diego County (451 installs), followed by Orange County (11).

How often does CM Electric AV Automations Incorpor install batteries with solar?

Battery storage is not recorded on its interconnected solar installs: SDG&E files a battery as its own project record, not on the solar record.

How many CM Electric AV Automations Incorpor installs are under NEM 3.0 (the Net Billing Tariff)?

17 of its 462 interconnected installs (3.7% of the 461 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and battery storage is not recorded on those SDG&E solar records. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.