Eclipse Energy and Construction

How many solar installs has Eclipse Energy and Construction done in California, and which license number is on its installs?

Eclipse Energy and Construction has 63 residential solar installs interconnected in California, active in the records from 2019 through 2025 (Apr 17, 2019 to Aug 4, 2025), most of them in Contra Costa County (11), San Joaquin County (11) and Nevada County (6). CSLB lists license 1049090 (ECLIPSE SOLAR & CONSTRUCTION) with status Work Comp Susp in the License Master file pulled Nov 4, 2026, classifications B, C-10, C-46, expires Jan 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
63
Last 24 months
1
Total capacity
453.1 kW DC
Median system size
6.7 kW DC
With battery storage
0.0% all time; 0.0% last 24 months
Third-party owned
0.0% of 63 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
none recorded
First install
Apr 17, 2019
Latest install
Aug 4, 2025
Counties
16
Utilities
PGE 62, SCE 1
CSLB license
1049090

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2019 to 2026

YearInstalls interconnectedWith battery storage
2019610
202010
202100
202200
202300
202400
202510
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 63 interconnected installs with a tariff recorded (63) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.063100.0%0 (0.0%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Eclipse Energy and Construction’s installs. No residential system in the file lists a third-party owner name that matches Eclipse Energy and Construction exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 1 of Eclipse Energy and Construction’s 1 installs name a module maker in the “Generator Manufacturer” fields, and most of those (1, 100.0%) used modules recorded as SunPower.

In the last 24 months, 1 of Eclipse Energy and Construction’s 1 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (1, 100.0%) used inverters recorded as Enphase.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSunPower12
Inverter makerEnphase12

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 63 of 63 installs, inverters on 63. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1049090ECLIPSE SOLAR & CONSTRUCTION (Corporation)Work Comp SuspB General Building Contractor; C-10 Electrical Contractor; C-46 Solar ContractorJan 16, 2019Jan 31, 202762

License numbers are the ones the utilities recorded on the interconnection applications (62 of 63 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1049090. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list Eclipse Energy and Construction’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense20202021Total
unincorporated Marin County1049090347

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
Contra Costa11
San Joaquin11
Nevada6
Placer5
Yolo5
Solano4
Sonoma4
Amador3
El Dorado3
Fresno3
Sutter2
Tuolumne2
Butte1
Calaveras1
Kings1
Napa1

Top cities

CityInstalls
Stockton10
Antioch8
Penn Valley5
Vacaville3
Woodland3
El Dorado Hills2
Fresno2
Granite Bay2
Lincoln2
Oakley2
West Sacramento2
Windsor2
Yuba City2
Clovis1
El Sobrante1

Names as recorded by the utilities

The utilities recorded this installer under 7 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Eclipse Energy and Construction42
eclipse energy & construction9
Eclipse energy and construction8
Eclipse Energy & Construction1
ECLIPSE ENERGY & CONSTRUCTION1
eclipse energy and construction1
Eclipse energy and Construction1

Common questions

Where does Eclipse Energy and Construction install solar?

Its installs are spread across 16 counties. The most are in Contra Costa County (11 installs), followed by San Joaquin County (11).

How often does Eclipse Energy and Construction install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years, and 0.0% in the last 24 months (0 of 1).

How many Eclipse Energy and Construction installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 63 interconnected installs with a tariff recorded (63) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.