Elite Electric Inc has 1,175 residential solar installs interconnected in California, active in the records from 2009 through 2025 (May 12, 2009 to Jan 31, 2025), most of them in Los Angeles County (340), Riverside County (225) and San Bernardino County (126). CSLB lists license 418242 (ELITE ELECTRIC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, expires Feb 29, 2028.
License status changes daily. Confirm it on CSLB’s own license check before relying on it.
- Interconnected installs
- 1,175
- Last 24 months
- 3
- Total capacity
- 7,441.9 kW DC
- Median system size
- 5.3 kW DC
- With battery storage
- 0.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; not recorded (SDG&E files batteries as separate projects, not on the solar record) last 24 months
- Third-party owned
- 42.0% of 1,075 installs where ownership was reported
- Net Billing Tariff (NEM 3.0)
- 0 installs
- Ownership types recorded
- PPA 28, lease 402, other 22
- First install
- May 12, 2009
- Latest install
- Jan 31, 2025
- Counties
- 21
- Utilities
- SCE 830, PGE 280, SDGE 65
- CSLB license
- 418242
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installs by year, 2009 to 2026
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2009 | 15 | 0 |
| 2010 | 25 | 0 |
| 2011 | 94 | 0 |
| 2012 | 292 | 0 |
| 2013 | 83 | 0 |
| 2014 | 92 | 0 |
| 2015 | 260 | 0 |
| 2016 | 293 | 0 |
| 2017 | 5 | 0 |
| 2018 | 2 | 0 |
| 2019 | 2 | 0 |
| 2020 | 0 | 0 |
| 2021 | 2 | 0 |
| 2022 | 7 | 0 |
| 2023 | 0 | 0 |
| 2024 | 0 | 0 |
| 2025 | 3 | 0 |
| 2026 (through Aug 31, 2026) | 0 | 0 |
The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.
Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)
None of its 1,175 interconnected installs with a tariff recorded (1,175) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.
| Tariff recorded by the utility | Installs | Share of installs with a tariff | With battery storage |
|---|---|---|---|
| NEM 1.0 | 1,150 | 97.9% | not counted |
| NEM 2.0 | 25 | 2.1% | 0 (0.0%) |
| Net Billing Tariff | 0 | 0.0% | 0 |
The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.
Leases, PPAs and third-party owners
On 452 of Elite Electric Inc’s installs the utility recorded a third-party ownership type: PPA 28, lease 402, prepaid lease 0, other 22. Across all installers, 2 residential systems list a third-party owner name that matches Elite Electric Inc exactly (after removing case, punctuation and suffixes such as Inc or LLC).
| Third-party owner named on its installs | Installs |
|---|---|
| SunPower Solar Program 1, LLC | 265 |
| Sunpower Corp | 96 |
| PV Home PPA 1, LLC | 18 |
| SunLux Energy | 18 |
| SunPower Solar Program I, LLC | 18 |
Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.
Equipment recorded
In the last 24 months, 3 of Elite Electric Inc’s 3 installs name a module maker in the “Generator Manufacturer” fields, and most of those (3, 100.0%) used modules recorded as SunPower.
In the last 24 months, 3 of Elite Electric Inc’s 3 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (3, 100.0%) used inverters recorded as SunPower.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | SunPower | 3 | 504 |
| Inverter maker | SunPower | 3 | 424 |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 566 of 1,175 installs, inverters on 1,174. See the methodology and the equipment index.
SGIP battery storage projects
The SGIP report names Elite Electric Inc as developer on 0 battery storage projects and as installer on 26 (0 name it as both), 26 projects in all with 24,019 kWh of storage. 5 have the status Paid, with $480,940 in current incentive allocations. Applications were received from Jun 5, 2017 to Nov 11, 2025.
By status
| Status as published | Projects | Storage kWh | Current incentive |
|---|---|---|---|
| Paid | 5 | 1,318 | $480,940 |
| PBI in Process | 5 | 3,693 | $1,567,952 |
| Reserved | 8 | 15,072 | $3,984,499 |
| Cancelled | 8 | 3,936 | $1,120,313 |
By budget category
| Budget category | Projects | Storage kWh | Current incentive | Paid projects | Paid: current incentive |
|---|---|---|---|---|---|
| Large-Scale Storage | 11 | 20,315 | $3,723,812 | 3 | $465,860 |
| Equity Resiliency | 9 | 3,062 | $2,918,646 | 0 | $0 |
| Non-Residential Storage Equity | 4 | 589 | $496,166 | 0 | $0 |
| Small Residential Storage | 2 | 53 | $15,080 | 2 | $15,080 |
Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.
A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.
Contractor license
| License | CSLB business name | CSLB status, file pulled Nov 4, 2026 | Classifications | Issued | Expires | Installs reported |
|---|---|---|---|---|---|---|
| 418242 | ELITE ELECTRIC (Corporation) | CLEAR | B General Building Contractor; C-10 Electrical Contractor | Feb 16, 1982 | Feb 29, 2028 | 1,119 |
License numbers are the ones the utilities recorded on the interconnection applications (1,123 of 1,175 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.
Disciplinary bonds and pending actions in the License Master file
The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 418242. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.
Counties
| County | Installs |
|---|---|
| Los Angeles | 340 |
| Riverside | 225 |
| San Bernardino | 126 |
| Orange | 122 |
| Santa Clara | 92 |
| Alameda | 62 |
| San Diego | 44 |
| San Mateo | 42 |
| San Francisco | 40 |
| Contra Costa | 34 |
| Ventura | 31 |
| Santa Barbara | 6 |
| Marin | 2 |
| Solano | 2 |
| Butte | 1 |
| El Dorado | 1 |
| Fresno | 1 |
| Kern | 1 |
| Monterey | 1 |
| San Joaquin | 1 |
| Sonoma | 1 |
Top cities
| City | Installs |
|---|---|
| San Jose | 45 |
| Riverside | 42 |
| San Francisco | 40 |
| Corona | 39 |
| Arcadia | 35 |
| Irvine | 22 |
| Murrieta | 22 |
| Moreno Valley | 21 |
| Chino Hills | 20 |
| Rowland Heights | 17 |
| Walnut | 17 |
| Fremont | 14 |
| West Covina | 14 |
| Monterey Park | 13 |
| Oakland | 13 |
Names as recorded by the utilities
The utilities recorded this installer under 10 spellings. See the methodology for how spellings are combined.
| Installer name as recorded | Installs |
|---|---|
| ELITE ELECTRIC INC | 441 |
| Elite Electric Inc | 323 |
| Elite Electric Inc. | 235 |
| Elite Electric | 155 |
| Elite-Electric Inc. | 9 |
| ELITE ELECTRIC | 3 |
| ELITE ELECTRIC INC. | 3 |
| Elite Electric, Inc. | 3 |
| Elite Electric, Inc | 2 |
| Elite Electric inc | 1 |
Common questions
Where does Elite Electric Inc install solar?
Its installs are spread across 21 counties. The most are in Los Angeles County (340 installs), followed by Riverside County (225).
How often does Elite Electric Inc install batteries with solar?
0.0% of its interconnected solar installs include battery storage across all years. Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.
How many Elite Electric Inc installs are under NEM 3.0 (the Net Billing Tariff)?
None of its 1,175 interconnected installs with a tariff recorded (1,175) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
- Self-Generation Incentive Program (SGIP) program administrators: Real-Time Public Report of SGIP applications (selfgenca.com)