How many solar installs has Energy Renovation Center done in California, and which license number is on its installs?

Energy Renovation Center has 930 residential solar installs interconnected in California, active in the records from 2015 through 2026 (Dec 22, 2015 to Aug 4, 2026), most of them in Riverside County (332), San Bernardino County (325) and Los Angeles County (132). CSLB lists license 1009326 (ENERGY RENOVATION CENTER INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, C-53, expires Nov 30, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
930
Last 24 months
13
Total capacity
6,404.2 kW DC
Median system size
6.2 kW DC
With battery storage
3.3% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 91.7% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
4.3% of 930 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
41 installs, latest Aug 4, 2026
Ownership types recorded
PPA 28, lease 12
Median battery size
12 kWh (28 installs list a capacity)
First install
Dec 22, 2015
Latest install
Aug 4, 2026
Counties
11
Utilities
SCE 851, SDGE 54, PGE 25
CSLB license
1009326

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2015 to 2026

YearInstalls interconnectedWith battery storage
201520
2016980
20171290
2018621
2019861
20201020
20211360
20221630
20231182
20242316
202565
2026 (through Aug 31, 2026)54

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

41 of its 930 interconnected installs (4.4% of the 930 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 66.7% of those on PG&E and SCE records include battery storage. The latest Net Billing Tariff install was approved Aug 4, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.017318.6%not counted
NEM 2.071677.0%3 (0.5%)
Net Billing Tariff414.4%26 (66.7%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 40 of Energy Renovation Center’s installs the utility recorded a third-party ownership type: PPA 28, lease 12, prepaid lease 0, other 0. Across all installers, 6 residential systems list a third-party owner name that matches Energy Renovation Center exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
Sunnova Energy International9
Sunnova Corporation7
ENERGY RENOVATION CENTER INC6
Sunnova Energy Corporation5
Lightreach4

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 13 of Energy Renovation Center’s 13 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (6, 46.2%) used modules recorded as SEG Solar.

In the last 24 months, 13 of Energy Renovation Center’s 13 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (11, 84.6%) used inverters recorded as Tesla.

In the last 24 months, 11 of Energy Renovation Center’s 13 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (10, 90.9%) used batteries recorded as Tesla.

29 of 29 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSEG Solar660
Qcells3151
JinkoSolar1not in top list
REC1204
S-EnergyCo.,Ltd.1not in top list
Inverter makerTesla1133
Enphase2363
Battery makerTesla1010
FranklinWH14

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 901 of 930 installs, inverters on 930. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1009326ENERGY RENOVATION CENTER INC (Corporation)CLEARB General Building Contractor; C-10 Electrical Contractor; C-53Dec 2, 2015Nov 30, 2027928

License numbers are the ones the utilities recorded on the interconnection applications (928 of 930 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1009326. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list Energy Renovation Center’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense20182019202020212022Total
unincorporated San Diego County10093261125211

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
Riverside332
San Bernardino325
Los Angeles132
San Diego53
Orange48
Kern15
Fresno13
Ventura6
Tulare4
Kings1
Madera1

Top cities

CityInstalls
Victorville75
Moreno Valley46
Fontana39
Riverside30
San Bernardino30
Perris28
Hesperia26
Apple Valley25
Hemet24
Menifee23
Adelanto22
Corona22
Beaumont21
San Jacinto20
Murrieta17

Names as recorded by the utilities

The utilities recorded this installer under 5 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
ENERGY RENOVATION CENTER349
ENERGY RENOVATION CENTER INC292
Energy Renovation Center286
Energy Renovation center2
Energy renovation center1

Common questions

Where does Energy Renovation Center install solar?

Its installs are spread across 11 counties. The most are in Riverside County (332 installs), followed by San Bernardino County (325).

How often does Energy Renovation Center install batteries with solar?

3.3% of its interconnected solar installs include battery storage across all years, and 91.7% in the last 24 months (11 of 12). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Energy Renovation Center installs are under NEM 3.0 (the Net Billing Tariff)?

41 of its 930 interconnected installs (4.4% of the 930 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 66.7% of those on PG&E and SCE records include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.