GCI ENERGY

How many solar installs has GCI ENERGY done in California, and which license number is on its installs?

GCI ENERGY has 237 residential solar installs interconnected in California, active in the records from 2012 through 2018 (Aug 17, 2012 to Feb 23, 2018), most of them in San Diego County (196) and Orange County (41). The license number recorded on most of its installs, 1004645, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
237
Last 24 months
0
Total capacity
1,298.2 kW DC
Median system size
5.1 kW DC
With battery storage
not recorded (SDG&E files batteries as separate projects, not on the solar record) all time; no installs in the last 24 months last 24 months
Third-party owned
41.7% of 120 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
PPA 21, lease 29
First install
Aug 17, 2012
Latest install
Feb 23, 2018
Counties
2
Utilities
SDGE 237
CSLB license
1004645

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2012 to 2026

YearInstalls interconnectedWith battery storage
201240
2013290
2014520
2015900
2016470
2017140
201810
201900
202000
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 237 interconnected installs with a tariff recorded (237) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.021189.0%not counted
NEM 2.02611.0%not recorded
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 50 of GCI ENERGY’s installs the utility recorded a third-party ownership type: PPA 21, lease 29, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches GCI ENERGY exactly.

Third-party owner named on its installsInstalls
SUNNOVA22
GCI SOLAR7
CLEAN POWER FINANCE6
INTEGRYS5
SunRun5

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 224 of GCI ENERGY’s 237 installs name a module maker in the “Generator Manufacturer” fields, and most of those (152, 67.9%) used modules recorded as LG.

Across all years, 230 of GCI ENERGY’s 237 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (176, 76.5%) used inverters recorded as Enphase.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerLG0152
Sharp061
Trina Solar010
Qcells01
Inverter makerEnphase0176
SMA055

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 224 of 237 installs, inverters on 230. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1004645Not found in the CSLB License Master file pulled Nov 4, 202640

License numbers are the ones the utilities recorded on the interconnection applications (40 of 237 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Other names reported under the same license

Counties

CountyInstalls
San Diego196
Orange41

Top cities

CityInstalls
San Diego57
Fallbrook15
Escondido14
Chula Vista10
El Cajon10
Laguna Niguel10
Oceanside10
Mission Viejo9
La Mesa8
Vista8
Carlsbad7
Encinitas6
Laguna Hills6
San Clemente6
Spring Valley6

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
GCI ENERGY237

Common questions

Where does GCI ENERGY install solar?

Its installs are spread across 2 counties. The most are in San Diego County (196 installs), followed by Orange County (41).

How often does GCI ENERGY install batteries with solar?

Battery storage is not recorded on its interconnected solar installs: SDG&E files a battery as its own project record, not on the solar record.

How many GCI ENERGY installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 237 interconnected installs with a tariff recorded (237) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.