Golden Valley Solar

How many solar installs has Golden Valley Solar done in California, and which license number is on its installs?

Golden Valley Solar has 69 residential solar installs interconnected in California, active in the records from 2019 through 2025 (Apr 15, 2019 to Feb 12, 2025), most of them in Santa Clara County (27), Fresno County (16) and Madera County (6). CSLB lists license 1049059 (GOLDEN VALLEY SERVICES INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Dec 31, 2026.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
69
Last 24 months
4
Total capacity
551.2 kW DC
Median system size
7.6 kW DC
With battery storage
14.5% all time; 75.0% last 24 months
Third-party owned
18.8% of 69 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
10 installs, latest Oct 17, 2024
Ownership types recorded
PPA 12, lease 1
Median battery size
9.7 kWh (6 installs list a capacity)
First install
Apr 15, 2019
Latest install
Feb 12, 2025
Counties
12
Utilities
PGE 67, SCE 2
CSLB license
1049059

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2019 to 2026

YearInstalls interconnectedWith battery storage
2019230
2020280
202130
202200
202311
2024139
202510
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

10 of its 69 interconnected installs (14.5% of the 69 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 90.0% of those include battery storage. The latest Net Billing Tariff install was approved Oct 17, 2024.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.05985.5%1 (1.7%)
Net Billing Tariff1014.5%9 (90.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 13 of Golden Valley Solar’s installs the utility recorded a third-party ownership type: PPA 12, lease 1, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches Golden Valley Solar exactly.

Third-party owner named on its installsInstalls
Thrive Power8
Thive Power2
Thrive2
Everbright1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 3 of Golden Valley Solar’s 4 installs name a module maker in the “Generator Manufacturer” fields, and most of those (2, 66.7%) used modules recorded as Mission Solar.

In the last 24 months, 4 of Golden Valley Solar’s 4 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (2, 50.0%) used inverters recorded as SolarEdge.

In the last 24 months, 2 of Golden Valley Solar’s 4 installs name a battery maker in the “Generator Manufacturer” fields, and the most common maker (1, 50.0%) used batteries recorded as Enphase.

6 of 10 battery-paired PG&E and SCE installs (60.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerMission Solar26
Qcells1not in top list
Inverter makerSolarEdge26
Enphase156
Sol-Ark12
Battery makerEnphase15
SolarEdge11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 65 of 69 installs, inverters on 69. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1049059GOLDEN VALLEY SERVICES INC (Corporation)CLEARC-10 Electrical ContractorJan 16, 2019Dec 31, 202669

License numbers are the ones the utilities recorded on the interconnection applications (69 of 69 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1049059. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list Golden Valley Solar’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense2021Total
City and County of San Francisco104905911

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
Santa Clara27
Fresno16
Madera6
Merced4
Kings3
San Benito3
Santa Cruz3
San Joaquin2
Tulare2
El Dorado1
Humboldt1
Mariposa1

Top cities

CityInstalls
San Jose12
Fresno11
Morgan Hill6
Madera5
Gilroy4
Avenal3
Hollister3
Capitola2
Clovis2
Los Altos2
Merced2
Cupertino1
El Dorado1
Fowler1
Kerman1

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
GOLDEN VALLEY SOLAR59
Golden Valley Solar10

Common questions

Where does Golden Valley Solar install solar?

Its installs are spread across 12 counties. The most are in Santa Clara County (27 installs), followed by Fresno County (16).

How often does Golden Valley Solar install batteries with solar?

14.5% of its interconnected solar installs include battery storage across all years, and 75.0% in the last 24 months (3 of 4).

How many Golden Valley Solar installs are under NEM 3.0 (the Net Billing Tariff)?

10 of its 69 interconnected installs (14.5% of the 69 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 90.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.