Green Conception

How many solar installs has Green Conception done in California, and which license number is on its installs?

Green Conception has 381 residential solar installs interconnected in California, active in the records from 2014 through 2026 (Jan 9, 2014 to Aug 25, 2026), most of them in Los Angeles County (239), Ventura County (59) and San Bernardino County (24). CSLB lists license 964965 (GREEN CONCEPTION INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, expires Aug 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
381
Last 24 months
73
Total capacity
3,202.8 kW DC
Median system size
7.6 kW DC
With battery storage
22.0% all time; 89.0% last 24 months
Third-party owned
0.0% of 376 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
88 installs, latest Aug 25, 2026
Ownership types recorded
none recorded
Median battery size
13.5 kWh (71 installs list a capacity)
First install
Jan 9, 2014
Latest install
Aug 25, 2026
Counties
11
Utilities
SCE 362, PGE 19
CSLB license
964965

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2014 to 2026

YearInstalls interconnectedWith battery storage
201420
2015130
2016260
2017291
2018381
2019210
2020210
2021280
2022390
2023660
20243523
20253432
2026 (through Aug 31, 2026)2927

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

88 of its 381 interconnected installs (23.1% of the 381 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 92.0% of those include battery storage. The latest Net Billing Tariff install was approved Aug 25, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.05514.4%not counted
NEM 2.023862.5%2 (0.8%)
Net Billing Tariff8823.1%81 (92.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Green Conception’s installs. No residential system in the file lists a third-party owner name that matches Green Conception exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 73 of Green Conception’s 73 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (36, 49.3%) used modules recorded as REC.

In the last 24 months, 73 of Green Conception’s 73 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (37, 50.7%) used inverters recorded as Enphase.

In the last 24 months, 65 of Green Conception’s 73 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (36, 55.4%) used batteries recorded as Tesla.

83 of 84 battery-paired PG&E and SCE installs (98.8%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerREC3645
JA Solar1818
Qcells1144
Silfab4161
Aptos Solar2not in top list
Inverter makerEnphase37158
Tesla3641
SMA1not in top list
SolarEdge1158
Battery makerTesla3636
Enphase2945

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 369 of 381 installs, inverters on 381. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Green Conception as developer on 0 battery storage projects and as installer on 3 (0 name it as both), 3 projects in all with 40 kWh of storage. 1 have the status Paid, with $1,980 in current incentive allocations. Applications were received from Sep 8, 2025 to Nov 3, 2025.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid113$1,980
Pending Reservation113$17,341
Cancelled113$29,871

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Residential Solar and Storage Equity - AB 209 Non-POU226$47,2120$0
Small Residential Storage113$1,9801$1,980

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
964965GREEN CONCEPTION INC (Corporation)CLEARB General Building ContractorAug 26, 2011Aug 31, 2027377

License numbers are the ones the utilities recorded on the interconnection applications (377 of 381 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 964965. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Los Angeles239
Ventura59
San Bernardino24
Riverside17
Orange15
Santa Barbara8
Alameda6
Santa Clara6
Contra Costa3
Kern3
Sonoma1

Top cities

CityInstalls
Santa Clarita16
Long Beach14
Thousand Oaks14
Canyon Country12
Valencia12
Arcadia11
Camarillo11
Newbury Park11
Simi Valley11
Torrance11
Agoura Hills10
Culver City8
Saugus8
Sierra Madre8
Joshua Tree6

Names as recorded by the utilities

The utilities recorded this installer under 6 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
GREEN CONCEPTION INC269
Green Conception98
GREEN CONCEPTION9
GREEN CONCEPTION,3
green conception1
Green conception1

Common questions

Where does Green Conception install solar?

Its installs are spread across 11 counties. The most are in Los Angeles County (239 installs), followed by Ventura County (59).

How often does Green Conception install batteries with solar?

22.0% of its interconnected solar installs include battery storage across all years, and 89.0% in the last 24 months (65 of 73).

How many Green Conception installs are under NEM 3.0 (the Net Billing Tariff)?

88 of its 381 interconnected installs (23.1% of the 381 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 92.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.