Green Hill Remodeling has 260 residential solar installs interconnected in California, active in the records from 2011 through 2023 (Sep 6, 2011 to Jun 22, 2023), most of them in Los Angeles County (115), Kern County (29) and Orange County (22). CSLB lists license 938682 (GREEN HILL SOLAR INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-39, C-46, expires Oct 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
260
Last 24 months
0
Total capacity
1,217.5 kW DC
Median system size
4 kW DC
With battery storage
0.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; no installs in the last 24 months last 24 months
Third-party owned
0.0% of 259 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
none recorded
First install
Sep 6, 2011
Latest install
Jun 22, 2023
Counties
12
Utilities
SCE 187, PGE 71, SDGE 2
CSLB license
938682

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2011 to 2026

YearInstalls interconnectedWith battery storage
201130
201200
201360
2014140
20151010
2016420
2017250
2018100
2019120
2020390
202140
202200
202340
202400
202500
2026 (through Aug 31, 2026)00

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 260 interconnected installs with a tariff recorded (260) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.018470.8%not counted
NEM 2.07629.2%0 (0.0%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Green Hill Remodeling’s installs. No residential system in the file lists a third-party owner name that matches Green Hill Remodeling exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 236 of Green Hill Remodeling’s 260 installs name a module maker in the “Generator Manufacturer” fields, and most of those (169, 71.6%) used modules recorded as SolarWorld.

Across all years, 260 of Green Hill Remodeling’s 260 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (166, 63.8%) used inverters recorded as SolarEdge.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSolarWorld0169
Mission Solar028
Qcells017
LG05
Silfab03
Inverter makerSolarEdge0166
Enphase053
Power-One018
ABB010
SMA07

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 236 of 260 installs, inverters on 260. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
938682GREEN HILL SOLAR INC (Corporation)CLEARB General Building Contractor; C-39 Roofing Contractor; C-46 Solar ContractorOct 12, 2009Oct 31, 2027258

License numbers are the ones the utilities recorded on the interconnection applications (260 of 260 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 938682. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list Green Hill Remodeling’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense2018Total
unincorporated San Diego County93868211

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
Los Angeles115
Kern29
Orange22
Ventura22
San Luis Obispo16
Santa Clara16
San Bernardino14
Santa Barbara13
Riverside9
San Mateo2
Alameda1
Tulare1

Top cities

CityInstalls
Bakersfield24
Lancaster10
Santa Maria9
Long Beach8
Palmdale8
Paso Robles7
San Jose7
Los Angeles6
Torrance6
Cerritos5
Chino Hills5
Oxnard5
Simi Valley5
Atascadero4
Hawthorne4

Names as recorded by the utilities

The utilities recorded this installer under 10 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
GREEN HILL REMODELING INC109
Green Hill Remodeling96
Green Hill Remodeling Inc22
GREEN HILL REMODELING16
green hill remodeling inc6
green hill remodeling5
Green Hill Remodeling Inc.3
green hill remodeling inc.1
Green Hill Remodeling inc.1
Green HIll Remodeling, Inc.1

Common questions

Where does Green Hill Remodeling install solar?

Its installs are spread across 12 counties. The most are in Los Angeles County (115 installs), followed by Kern County (29).

How often does Green Hill Remodeling install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years. Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Green Hill Remodeling installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 260 interconnected installs with a tariff recorded (260) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.