GREEN MILE ENERGY

How many solar installs has GREEN MILE ENERGY done in California, and which license number is on its installs?

GREEN MILE ENERGY has 177 residential solar installs interconnected in California, active in the records from 2019 through 2026 (Sep 26, 2019 to Aug 28, 2026), most of them in Los Angeles County (85), Orange County (48) and Ventura County (11). CSLB lists license 1035512 (GREEN MILE ENERGY) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, C-39, expires Jul 31, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
177
Last 24 months
118
Total capacity
1,471.6 kW DC
Median system size
7.7 kW DC
With battery storage
55.4% all time; 78.0% last 24 months
Third-party owned
9.6% of 177 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
117 installs, latest Aug 28, 2026
Ownership types recorded
PPA 13, lease 4
Median battery size
13.5 kWh (94 installs list a capacity)
First install
Sep 26, 2019
Latest install
Aug 28, 2026
Counties
16
Utilities
SCE 160, PGE 17
CSLB license
1035512

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2019 to 2026

YearInstalls interconnectedWith battery storage
201910
202020
2021160
2022141
2023233
2024159
20256856
2026 (through Aug 31, 2026)3829

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

117 of its 177 interconnected installs (66.1% of the 177 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 78.6% of those include battery storage. The latest Net Billing Tariff install was approved Aug 28, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.06033.9%6 (10.0%)
Net Billing Tariff11766.1%92 (78.6%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 17 of GREEN MILE ENERGY’s installs the utility recorded a third-party ownership type: PPA 13, lease 4, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches GREEN MILE ENERGY exactly.

Third-party owner named on its installsInstalls
Goodleap7
LightReach, a division of Palmetto Solar, LLC5
HDM Renewable Finance2
LightReach2
EnFin1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 117 of GREEN MILE ENERGY’s 118 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (27, 23.1%) used modules recorded as CertainTeed.

In the last 24 months, 118 of GREEN MILE ENERGY’s 118 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (58, 49.2%) used inverters recorded as Enphase.

In the last 24 months, 87 of GREEN MILE ENERGY’s 118 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (56, 64.4%) used batteries recorded as Tesla.

93 of 98 battery-paired PG&E and SCE installs (94.9%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerCertainTeed2757
Qcells1627
Panasonic1516
Waaree1414
Hyundai1313
Inverter makerEnphase5893
Tesla5151
Panasonic44
SolarEdge419
Fronius1not in top list
Battery makerTesla5657
Enphase2227
SunPower66
SolarEdge22
Panasonic11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 175 of 177 installs, inverters on 177. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1035512GREEN MILE ENERGY (Corporation)CLEARB General Building Contractor; C-10 Electrical Contractor; C-39 Roofing ContractorFeb 1, 2018Jul 31, 2028177

License numbers are the ones the utilities recorded on the interconnection applications (177 of 177 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1035512. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list GREEN MILE ENERGY’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense2024Total
unincorporated San Diego County103551211

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
Los Angeles85
Orange48
Ventura11
San Bernardino8
Riverside6
Santa Clara4
Contra Costa3
Santa Barbara3
Alameda2
Fresno1
Merced1
San Joaquin1
San Mateo1
Santa Cruz1
Shasta1
Yuba1

Top cities

CityInstalls
Agoura Hills6
Costa Mesa6
Huntington Beach6
Simi Valley5
La Canada4
Long Beach4
Mission Viejo4
Newport Beach4
Orange4
Cerritos3
Fountain Valley3
Irvine3
La Puente3
Lakewood3
Palm Springs3

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
GREEN MILE ENERGY176
Green Mile Energy1

Common questions

Where does GREEN MILE ENERGY install solar?

Its installs are spread across 16 counties. The most are in Los Angeles County (85 installs), followed by Orange County (48).

How often does GREEN MILE ENERGY install batteries with solar?

55.4% of its interconnected solar installs include battery storage across all years, and 78.0% in the last 24 months (92 of 118).

How many GREEN MILE ENERGY installs are under NEM 3.0 (the Net Billing Tariff)?

117 of its 177 interconnected installs (66.1% of the 177 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 78.6% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.