H L V ELECTRIC CO

How many solar installs has H L V ELECTRIC CO done in California, and which license number is on its installs?

H L V ELECTRIC CO has 305 residential solar installs interconnected in California, active in the records from 2021 through 2025 (Jan 7, 2021 to Oct 3, 2025), most of them in Los Angeles County (196), Orange County (81) and San Bernardino County (20). CSLB lists license 910748 (H L V ELECTRIC CO) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Nov 30, 2026.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
305
Last 24 months
61
Total capacity
2,294.4 kW DC
Median system size
7.2 kW DC
With battery storage
5.9% all time; 24.6% last 24 months
Third-party owned
6.2% of 305 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
68 installs, latest Sep 5, 2025
Ownership types recorded
lease 18, other 1
Median battery size
13.5 kWh (18 installs list a capacity)
First install
Jan 7, 2021
Latest install
Oct 3, 2025
Counties
4
Utilities
SCE 305
CSLB license
910748

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2021 to 2026

YearInstalls interconnectedWith battery storage
2021490
2022800
2023860
2024447
20254611
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

68 of its 305 interconnected installs (22.3% of the 305 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 26.5% of those include battery storage. The latest Net Billing Tariff install was approved Sep 5, 2025.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.023777.7%0 (0.0%)
Net Billing Tariff6822.3%18 (26.5%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 19 of H L V ELECTRIC CO’s installs the utility recorded a third-party ownership type: PPA 0, lease 18, prepaid lease 0, other 1. Across all installers, 6 residential systems list a third-party owner name that matches H L V ELECTRIC CO exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
SunPower Corporation8
H L V ELECTRIC CO6
SunPower Capital, LLC4

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 61 of H L V ELECTRIC CO’s 61 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (25, 41.0%) used modules recorded as Qcells.

In the last 24 months, 61 of H L V ELECTRIC CO’s 61 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (54, 88.5%) used inverters recorded as Enphase.

In the last 24 months, 14 of H L V ELECTRIC CO’s 61 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (10, 71.4%) used batteries recorded as Enphase.

17 of 18 battery-paired PG&E and SCE installs (94.4%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells2583
Hyundai1937
SunPower9135
Trina Solar66
EG41not in top list
Inverter makerEnphase54178
SolarEdge384
Tesla311
EG41not in top list
Battery makerEnphase1010
Tesla34
SunPower13

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 286 of 305 installs, inverters on 305. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
910748H L V ELECTRIC CO (Corporation)CLEARC-10 Electrical ContractorFeb 15, 2008Nov 30, 2026305

License numbers are the ones the utilities recorded on the interconnection applications (305 of 305 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 910748. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Other names reported under the same license

Counties

CountyInstalls
Los Angeles196
Orange81
San Bernardino20
Riverside8

Top cities

CityInstalls
Rosemead27
Garden Grove26
El Monte17
San Gabriel15
Temple City14
Fountain Valley13
Monterey Park13
Alhambra12
Long Beach11
Westminster10
Chino Hills9
Hacienda Heights9
Irvine8
West Covina8
Arcadia7

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
H L V ELECTRIC CO305

Common questions

Where does H L V ELECTRIC CO install solar?

Its installs are spread across 4 counties. The most are in Los Angeles County (196 installs), followed by Orange County (81).

How often does H L V ELECTRIC CO install batteries with solar?

5.9% of its interconnected solar installs include battery storage across all years, and 24.6% in the last 24 months (15 of 61).

How many H L V ELECTRIC CO installs are under NEM 3.0 (the Net Billing Tariff)?

68 of its 305 interconnected installs (22.3% of the 305 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 26.5% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.