HOME SMART CONSTRUCTION

How many solar installs has HOME SMART CONSTRUCTION done in California, and which license number is on its installs?

HOME SMART CONSTRUCTION has 361 residential solar installs interconnected in California, active in the records from 2020 through 2026 (Dec 3, 2020 to Feb 2, 2026), most of them in Santa Clara County (174), San Mateo County (72) and Alameda County (35). CSLB lists license 781685 (HOME SMART IMPROVEMENTS) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, expires Jul 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
361
Last 24 months
17
Total capacity
2,593.4 kW DC
Median system size
6.7 kW DC
With battery storage
8.6% all time; 64.7% last 24 months
Third-party owned
0.0% of 361 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
33 installs, latest Oct 29, 2025
Ownership types recorded
none recorded
Median battery size
27 kWh (4 installs list a capacity)
First install
Dec 3, 2020
Latest install
Feb 2, 2026
Counties
14
Utilities
PGE 361
CSLB license
781685

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2020 to 2026

YearInstalls interconnectedWith battery storage
202060
2021700
20221022
20231234
20244817
2025118
2026 (through Aug 31, 2026)10

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

33 of its 361 interconnected installs (9.1% of the 361 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 63.6% of those include battery storage. The latest Net Billing Tariff install was approved Oct 29, 2025.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.032890.9%10 (3.0%)
Net Billing Tariff339.1%21 (63.6%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on HOME SMART CONSTRUCTION’s installs. No residential system in the file lists a third-party owner name that matches HOME SMART CONSTRUCTION exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 13 of HOME SMART CONSTRUCTION’s 17 installs name a module maker in the “Generator Manufacturer” fields, and most of those (10, 76.9%) used modules recorded as SunPower.

In the last 24 months, 17 of HOME SMART CONSTRUCTION’s 17 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (17, 100.0%) used inverters recorded as Enphase.

In the last 24 months, 7 of HOME SMART CONSTRUCTION’s 17 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (4, 57.1%) used batteries recorded as Tesla.

26 of 31 battery-paired PG&E and SCE installs (83.9%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSunPower10295
Qcells22
CertainTeed11
Waaree141
Inverter makerEnphase17359
Tesla55
SunPower331
Delta Electronics1not in top list
Fronius1not in top list
Battery makerTesla44
SunPower221
Enphase11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 338 of 361 installs, inverters on 361. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
781685HOME SMART IMPROVEMENTS (Corporation)CLEARB General Building ContractorJul 18, 2000Jul 31, 2027361

License numbers are the ones the utilities recorded on the interconnection applications (361 of 361 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 781685. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Santa Clara174
San Mateo72
Alameda35
San Francisco27
Monterey12
San Benito12
Contra Costa11
Fresno8
Solano4
Kings2
Marin1
Placer1
San Joaquin1
Santa Cruz1

Top cities

CityInstalls
San Jose104
San Francisco27
Redwood City14
San Mateo13
Hollister12
Los Altos12
San Leandro11
Fremont9
Morgan Hill9
Mountain View9
Gilroy8
Sunnyvale8
Fresno7
Campbell6
Los Gatos6

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
HOME SMART CONSTRUCTION361

Common questions

Where does HOME SMART CONSTRUCTION install solar?

Its installs are spread across 14 counties. The most are in Santa Clara County (174 installs), followed by San Mateo County (72).

How often does HOME SMART CONSTRUCTION install batteries with solar?

8.6% of its interconnected solar installs include battery storage across all years, and 64.7% in the last 24 months (11 of 17).

How many HOME SMART CONSTRUCTION installs are under NEM 3.0 (the Net Billing Tariff)?

33 of its 361 interconnected installs (9.1% of the 361 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 63.6% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.