HPM SOLAR INC

How many solar installs has HPM SOLAR INC done in California, and which license number is on its installs?

HPM SOLAR INC has 505 residential solar installs interconnected in California, active in the records from 2019 through 2026 (Feb 13, 2019 to Aug 28, 2026), most of them in Los Angeles County (365), San Bernardino County (112) and Orange County (15). CSLB lists license 1048126 (HPM SOLAR INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-46, expires Dec 31, 2026.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
505
Last 24 months
111
Total capacity
4,294.8 kW DC
Median system size
8 kW DC
With battery storage
29.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 93.6% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
3.2% of 505 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
143 installs, latest Aug 28, 2026
Ownership types recorded
prepaid lease 16
Median battery size
10 kWh (145 installs list a capacity)
First install
Feb 13, 2019
Latest install
Aug 28, 2026
Counties
5
Utilities
SCE 502, PGE 2, SDGE 1
CSLB license
1048126

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2019 to 2026

YearInstalls interconnectedWith battery storage
2019340
2020421
2021744
20221014
20231014
20245339
20255250
2026 (through Aug 31, 2026)4844

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

143 of its 505 interconnected installs (28.3% of the 505 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 93.0% of those on PG&E and SCE records include battery storage. The latest Net Billing Tariff install was approved Aug 28, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.036271.7%14 (3.9%)
Net Billing Tariff14328.3%132 (93.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 16 of HPM SOLAR INC’s installs the utility recorded a third-party ownership type: PPA 0, lease 0, prepaid lease 16, other 0. No residential system in the file lists a third-party owner name that matches HPM SOLAR INC exactly.

Third-party owner named on its installsInstalls
SolSource DevCo LLC13
hdm capital llc3

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 111 of HPM SOLAR INC’s 111 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (53, 47.7%) used modules recorded as Hyundai.

In the last 24 months, 111 of HPM SOLAR INC’s 111 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (110, 99.1%) used inverters recorded as Enphase.

In the last 24 months, 103 of HPM SOLAR INC’s 111 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (102, 99.0%) used batteries recorded as Enphase.

143 of 146 battery-paired PG&E and SCE installs (97.9%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerHyundai5353
REC35353
Silfab923
JA Solar5not in top list
Qcells313
Inverter makerEnphase110323
SolarEdge2105
SMA111
Battery makerEnphase102140
Tesla11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 489 of 505 installs, inverters on 505. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names HPM SOLAR INC as developer on 18 battery storage projects and as installer on 18 (15 name it as both), 21 projects in all with 743 kWh of storage. 6 have the status Paid, with $19,748 in current incentive allocations. Applications were received from May 19, 2020 to Dec 30, 2025.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid666$19,748
Reserved9391$237,143
Waitlist19$23,327
Cancelled5277$62,445

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage12125$18,6734$5,767
Equity Resiliency458$55,3551$9,518
Large-Scale Storage2231$30,7001$4,463
Non-Residential Storage Equity2320$214,6090$0
Residential Solar and Storage Equity - AB 209 Non-POU19$23,3270$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1048126HPM SOLAR INC (Corporation)CLEARC-46 Solar ContractorDec 19, 2018Dec 31, 2026505

License numbers are the ones the utilities recorded on the interconnection applications (505 of 505 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1048126. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Los Angeles365
San Bernardino112
Orange15
Riverside11
Kern2

Top cities

CityInstalls
Claremont173
Glendora45
Upland39
La Verne27
Pomona20
Alta Loma16
Rancho Cucamonga16
San Dimas13
Chino Hills12
Covina12
Monrovia11
Arcadia9
Walnut9
Fontana7
Ontario7

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
HPM SOLAR INC503
HPM Solar2

Common questions

Where does HPM SOLAR INC install solar?

Its installs are spread across 5 counties. The most are in Los Angeles County (365 installs), followed by San Bernardino County (112).

How often does HPM SOLAR INC install batteries with solar?

29.0% of its interconnected solar installs include battery storage across all years, and 93.6% in the last 24 months (103 of 110). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many HPM SOLAR INC installs are under NEM 3.0 (the Net Billing Tariff)?

143 of its 505 interconnected installs (28.3% of the 505 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 93.0% of those on PG&E and SCE records include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.