Libery Solar

How many solar installs has Libery Solar done in California, and which license number is on its installs?

Libery Solar has 66 residential solar installs interconnected in California, active in the records from 2013 through 2026 (May 29, 2013 to Jan 16, 2026), most of them in San Diego County (63) and Orange County (3). CSLB lists license 843242 (sole owner license, name not shown) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-46, expires Jul 31, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
66
Last 24 months
7
Total capacity
415.7 kW DC
Median system size
5.8 kW DC
With battery storage
not recorded (SDG&E files batteries as separate projects, not on the solar record) all time; not recorded (SDG&E files batteries as separate projects, not on the solar record) last 24 months
Third-party owned
1.9% of 54 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
5 installs, latest Jan 16, 2026
Ownership types recorded
other 1
First install
May 29, 2013
Latest install
Jan 16, 2026
Counties
2
Utilities
SDGE 66
CSLB license
843242

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2013 to 2026

YearInstalls interconnectedWith battery storage
201370
201440
201560
2016140
201780
201850
201940
202020
202120
202220
202350
202410
202540
2026 (through Aug 31, 2026)20

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

5 of its 66 interconnected installs (7.6% of the 66 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and battery storage is not recorded on those SDG&E solar records. The latest Net Billing Tariff install was approved Jan 16, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.02639.4%not counted
NEM 2.03553.0%not recorded
Net Billing Tariff57.6%not recorded

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 1 of Libery Solar’s installs the utility recorded a third-party ownership type: PPA 0, lease 0, prepaid lease 0, other 1. No residential system in the file lists a third-party owner name that matches Libery Solar exactly.

Third-party owner named on its installsInstalls
Ron Turull1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 7 of Libery Solar’s 7 installs name a module maker in the “Generator Manufacturer” fields, and most of those (7, 100.0%) used modules recorded as Qcells.

In the last 24 months, 7 of Libery Solar’s 7 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (5, 71.4%) used inverters recorded as Tesla.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells718
Inverter makerTesla55
Enphase223

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 64 of 66 installs, inverters on 66. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
843242Sole owner license (name not shown)CLEARB General Building Contractor; C-46 Solar ContractorJul 22, 2004Jul 31, 202841

License numbers are the ones the utilities recorded on the interconnection applications (41 of 66 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 843242. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list Libery Solar’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense20182019Total
unincorporated San Diego County843242112

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
San Diego63
Orange3

Top cities

CityInstalls
Oceanside26
San Diego10
Carlsbad7
Encinitas4
Vista3
Chula Vista2
El Cajon2
Rancho Santa Fe2
San Clemente2
Santee2
Cardiff1
Dana Point1
Del Mar1
Fallbrook1
San Marcos1

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Libery Solar66

Common questions

Where does Libery Solar install solar?

Its installs are spread across 2 counties. The most are in San Diego County (63 installs), followed by Orange County (3).

How often does Libery Solar install batteries with solar?

Battery storage is not recorded on its interconnected solar installs: SDG&E files a battery as its own project record, not on the solar record.

How many Libery Solar installs are under NEM 3.0 (the Net Billing Tariff)?

5 of its 66 interconnected installs (7.6% of the 66 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and battery storage is not recorded on those SDG&E solar records. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.