MC Solar Engineering

How many solar installs has MC Solar Engineering done in California, and which license number is on its installs?

MC Solar Engineering has 132 residential solar installs interconnected in California, active in the records from 2001 through 2008 (Jun 28, 2001 to Jan 15, 2008), most of them in Santa Clara County (58), San Mateo County (22) and Alameda County (15). The utilities did not record a CSLB license number on enough of these installs to look one up.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
132
Last 24 months
0
Total capacity
574.2 kW DC
Median system size
3.5 kW DC
With battery storage
0.0% all time; no installs in the last 24 months last 24 months
Third-party owned
0.0% of 132 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
none recorded
First install
Jun 28, 2001
Latest install
Jan 15, 2008
Counties
13
Utilities
PGE 132
CSLB license
none reported

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2001 to 2026

YearInstalls interconnectedWith battery storage
200130
2002180
2003150
2004180
2005170
2006360
2007240
200810
200900
201000
201100
201200
201300
201400
201500
201600
201700
201800
201900
202000
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 132 interconnected installs with a tariff recorded (132) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.0132100.0%not counted
NEM 2.000.0%0
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on MC Solar Engineering’s installs. No residential system in the file lists a third-party owner name that matches MC Solar Engineering exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 113 of MC Solar Engineering’s 132 installs name a module maker in the “Generator Manufacturer” fields, and most of those (58, 51.3%) used modules recorded as BP Solar.

Across all years, 132 of MC Solar Engineering’s 132 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (82, 62.1%) used inverters recorded as Xantrex Technology Inc..

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerBP Solar058
Sharp019
Astro Power, Inc017
Evergreen Solar07
Shell Solar04
Inverter makerXantrex Technology Inc.082
SMA041
Sharp07
PV Powered02

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 113 of 132 installs, inverters on 132. See the methodology and the equipment index.

Contractor license

The utilities did not record a license number for enough of these installs to look one up.

License numbers are the ones the utilities recorded on the interconnection applications (0 of 132 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it.

Counties

CountyInstalls
Santa Clara58
San Mateo22
Alameda15
Santa Cruz13
San Francisco8
Contra Costa6
Monterey3
San Benito2
Amador1
Merced1
Napa1
San Luis Obispo1
Tuolumne1

Top cities

CityInstalls
San Jose19
Redwood City9
Sunnyvale9
Los Altos8
San Francisco8
Saratoga7
Cupertino5
Aptos4
Oakland4
Santa Cruz4
Fremont3
Los Altos Hills3
Menlo Park3
San Martin3
San Mateo3

Names as recorded by the utilities

The utilities recorded this installer under 4 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
MC Solar Engineering119
Mc Solar Engineering10
MC SOLAR ENGINEERING2
MC solar Engineering1

Common questions

Where does MC Solar Engineering install solar?

Its installs are spread across 13 counties. The most are in Santa Clara County (58 installs), followed by San Mateo County (22).

How often does MC Solar Engineering install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years.

How many MC Solar Engineering installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 132 interconnected installs with a tariff recorded (132) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.