NOVAQUORE LLC DBA GREEMPOWER

How many solar installs has NOVAQUORE LLC DBA GREEMPOWER done in California, and which license number is on its installs?

NOVAQUORE LLC DBA GREEMPOWER has 79 residential solar installs interconnected in California, active in the records from 2022 through 2026 (Jul 15, 2022 to Apr 16, 2026), most of them in Los Angeles County (35), Orange County (29) and San Bernardino County (10). CSLB lists license 1088598 (GREEMPOWER) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Mar 31, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
79
Last 24 months
15
Total capacity
713.6 kW DC
Median system size
8.2 kW DC
With battery storage
32.9% all time; 100.0% last 24 months
Third-party owned
0.0% of 79 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
21 installs, latest Apr 16, 2026
Ownership types recorded
none recorded
Median battery size
13.5 kWh (26 installs list a capacity)
First install
Jul 15, 2022
Latest install
Apr 16, 2026
Counties
5
Utilities
SCE 79
CSLB license
1088598

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2022 to 2026

YearInstalls interconnectedWith battery storage
2022180
2023407
202464
20251010
2026 (through Aug 31, 2026)55

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

21 of its 79 interconnected installs (26.6% of the 79 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 90.5% of those include battery storage. The latest Net Billing Tariff install was approved Apr 16, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.05873.4%7 (12.1%)
Net Billing Tariff2126.6%19 (90.5%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on NOVAQUORE LLC DBA GREEMPOWER’s installs. No residential system in the file lists a third-party owner name that matches NOVAQUORE LLC DBA GREEMPOWER exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 15 of NOVAQUORE LLC DBA GREEMPOWER’s 15 installs name a module maker in the “Generator Manufacturer” fields, and most of those (8, 53.3%) used modules recorded as Hyundai.

In the last 24 months, 15 of NOVAQUORE LLC DBA GREEMPOWER’s 15 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (13, 86.7%) used inverters recorded as Tesla.

In the last 24 months, 15 of NOVAQUORE LLC DBA GREEMPOWER’s 15 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (13, 86.7%) used batteries recorded as Tesla.

26 of 26 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerHyundai822
REC724
Inverter makerTesla1315
Enphase231
Battery makerTesla1313
Enphase213

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 79 of 79 installs, inverters on 79. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1088598GREEMPOWER (Limited Liability)CLEARC-10 Electrical ContractorMar 15, 2022Mar 31, 202879

License numbers are the ones the utilities recorded on the interconnection applications (79 of 79 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

CSLB’s License Master file lists a disciplinary bond on license 1088598 (bond reason recorded: Issuance), required Mar 15, 2022, $45,000, CSLB case number 2019000224, bond cancelled Apr 1, 2024. CSLB lists license 1088598 under the business name GREEMPOWER; the bond is on the license, as CSLB records it. Current CSLB record: 1088598.

What a disciplinary bond is: CSLB’s Bond Basics page says that when a license has been revoked, or in some instances suspended, for a violation of the Contractors State License Law, the contractor must file a disciplinary bond with the Registrar to reinstate, reissue or reapply for a license, and that the bond must stay on file for at least two years (CSLB Bond Basics). The file gives one disciplinary bond entry per license and does not say which of those circumstances applied, what the case was about or how it ended. CSLB’s license detail page shows any public disciplinary action.

Counties

CountyInstalls
Los Angeles35
Orange29
San Bernardino10
Riverside4
Ventura1

Top cities

CityInstalls
Irvine4
Santa Ana4
Upland4
Fullerton3
Huntington Beach3
Rancho Santa Margarita3
Beverly Hills2
Cerritos2
Chino2
Claremont2
Lake Forest2
Lakewood2
Lancaster2
Lawndale2
Rancho Cucamonga2

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
NOVAQUORE LLC DBA GREEMPOWER79

Common questions

Where does NOVAQUORE LLC DBA GREEMPOWER install solar?

Its installs are spread across 5 counties. The most are in Los Angeles County (35 installs), followed by Orange County (29).

How often does NOVAQUORE LLC DBA GREEMPOWER install batteries with solar?

32.9% of its interconnected solar installs include battery storage across all years, and 100.0% in the last 24 months (15 of 15).

How many NOVAQUORE LLC DBA GREEMPOWER installs are under NEM 3.0 (the Net Billing Tariff)?

21 of its 79 interconnected installs (26.6% of the 79 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 90.5% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.