PacWest Power

How many solar installs has PacWest Power done in California, and which license number is on its installs?

PacWest Power has 73 residential solar installs interconnected in California, active in the records from 2015 through 2017 (Aug 4, 2015 to Jul 13, 2017), most of them in Riverside County (30), San Bernardino County (21) and Los Angeles County (16). The license number recorded on most of its installs, 978235, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
73
Last 24 months
0
Total capacity
476.5 kW DC
Median system size
5.8 kW DC
With battery storage
0.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; no installs in the last 24 months last 24 months
Third-party owned
4.1% of 73 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
PPA 2, lease 1
First install
Aug 4, 2015
Latest install
Jul 13, 2017
Counties
6
Utilities
SCE 69, PGE 2, SDGE 2
CSLB license
978235

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2015 to 2026

YearInstalls interconnectedWith battery storage
201530
2016360
2017340
201800
201900
202000
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 73 interconnected installs with a tariff recorded (73) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.07095.9%not counted
NEM 2.034.1%0 (0.0%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 3 of PacWest Power’s installs the utility recorded a third-party ownership type: PPA 2, lease 1, prepaid lease 0, other 0. Across all installers, 2 residential systems list a third-party owner name that matches PacWest Power exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
PACWEST POWER2
Sunnova1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 73 of PacWest Power’s 73 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (30, 41.1%) used modules recorded as SolarWorld.

Across all years, 73 of PacWest Power’s 73 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (50, 68.5%) used inverters recorded as Enphase.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSolarWorld030
Hyundai023
Qcells08
LG06
Trina Solar04
Inverter makerEnphase050
SolarEdge013
Fronius09
SMA01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 73 of 73 installs, inverters on 73. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
978235Not found in the CSLB License Master file pulled Nov 4, 202672

License numbers are the ones the utilities recorded on the interconnection applications (72 of 73 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Counties

CountyInstalls
Riverside30
San Bernardino21
Los Angeles16
Orange3
Fresno2
San Diego1

Top cities

CityInstalls
Moreno Valley7
Claremont5
Corona4
Fontana4
Hemet3
Murrieta3
Riverside3
Apple Valley2
Fresno2
Irvine2
La Puente2
Nuevo2
Oak Hills2
Ontario2
Temecula2

Names as recorded by the utilities

The utilities recorded this installer under 5 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
PacWest Power50
PacWest Power LLC16
Pacwest Power3
pacwest power LLC2
Pacwest Power LLC2

Common questions

Where does PacWest Power install solar?

Its installs are spread across 6 counties. The most are in Riverside County (30 installs), followed by San Bernardino County (21).

How often does PacWest Power install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years. Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many PacWest Power installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 73 interconnected installs with a tariff recorded (73) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.