Phoenix Energy & Construction

How many solar installs has Phoenix Energy & Construction done in California, and which license number is on its installs?

Phoenix Energy & Construction has 40 residential solar installs interconnected in California, active in the records from 2013 through 2019 (Mar 18, 2013 to Oct 3, 2019), most of them in San Diego County (30), San Bernardino County (4) and Riverside County (3). The license number recorded on most of its installs, 942376, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
40
Last 24 months
0
Total capacity
212.8 kW DC
Median system size
4.7 kW DC
With battery storage
0.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; no installs in the last 24 months last 24 months
Third-party owned
0.0% of 34 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
none recorded
First install
Mar 18, 2013
Latest install
Oct 3, 2019
Counties
5
Utilities
SDGE 31, SCE 9
CSLB license
942376

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2013 to 2026

YearInstalls interconnectedWith battery storage
201320
201440
201540
201680
2017110
201860
201950
202000
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 40 interconnected installs with a tariff recorded (40) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.01640.0%not counted
NEM 2.02460.0%0 (0.0%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Phoenix Energy & Construction’s installs. No residential system in the file lists a third-party owner name that matches Phoenix Energy & Construction exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 40 of Phoenix Energy & Construction’s 40 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (20, 50.0%) used modules recorded as Axitec.

Across all years, 40 of Phoenix Energy & Construction’s 40 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (21, 52.5%) used inverters recorded as SMA.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerAxitec020
Silfab07
Qcells04
Canadian Solar03
LG02
Inverter makerSMA021
APsystems (Altenergy Power System)014
Enphase04
Schneider Electric01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 40 of 40 installs, inverters on 40. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
942376Not found in the CSLB License Master file pulled Nov 4, 202627

License numbers are the ones the utilities recorded on the interconnection applications (27 of 40 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Local solar permits naming its license

Solar permits in city and county open data that list Phoenix Energy & Construction’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense2018Total
unincorporated San Diego County94237611

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
San Diego30
San Bernardino4
Riverside3
Orange2
Los Angeles1

Top cities

CityInstalls
Oceanside10
Vista8
San Marcos4
San Diego3
Carlsbad2
Murrieta2
Rancho Cucamonga2
Alta Loma1
Chula Vista1
Escondido1
Grand Terrace1
La Habra1
La Mesa1
San Clemente1
Whittier1

Names as recorded by the utilities

The utilities recorded this installer under 3 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Phoenix Energy & Construction31
PHOENIX ENERGY AND CONSTRUCTION7
Phoenix Energy and Construction2

Common questions

Where does Phoenix Energy & Construction install solar?

Its installs are spread across 5 counties. The most are in San Diego County (30 installs), followed by San Bernardino County (4).

How often does Phoenix Energy & Construction install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years. Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Phoenix Energy & Construction installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 40 interconnected installs with a tariff recorded (40) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.