PHOENIX ENERGY FULFILLMENT INC DBA PHOENIX SOLAR ENERGY

How many solar installs has PHOENIX ENERGY FULFILLMENT INC DBA PHOENIX SOLAR ENERGY done in California, and which license number is on its installs?

PHOENIX ENERGY FULFILLMENT INC DBA PHOENIX SOLAR ENERGY has 227 residential solar installs interconnected in California, active in the records from 2018 through 2020 (Dec 3, 2018 to Mar 9, 2020), most of them in Butte County (110), Tehama County (30) and Glenn County (26). The license number recorded on most of its installs, 1039195, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
227
Last 24 months
0
Total capacity
1,426.1 kW DC
Median system size
5.7 kW DC
With battery storage
0.4% all time; no installs in the last 24 months last 24 months
Third-party owned
0.0% of 227 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
none recorded
First install
Dec 3, 2018
Latest install
Mar 9, 2020
Counties
16
Utilities
PGE 227
CSLB license
1039195

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2018 to 2026

YearInstalls interconnectedWith battery storage
201810
20192241
202020
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 227 interconnected installs with a tariff recorded (227) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.0227100.0%1 (0.4%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on PHOENIX ENERGY FULFILLMENT INC DBA PHOENIX SOLAR ENERGY’s installs. No residential system in the file lists a third-party owner name that matches PHOENIX ENERGY FULFILLMENT INC DBA PHOENIX SOLAR ENERGY exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 227 of PHOENIX ENERGY FULFILLMENT INC DBA PHOENIX SOLAR ENERGY’s 227 installs name a module maker in the “Generator Manufacturer” fields, and most of those (117, 51.5%) used modules recorded as Mission Solar.

Across all years, 227 of PHOENIX ENERGY FULFILLMENT INC DBA PHOENIX SOLAR ENERGY’s 227 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (225, 99.1%) used inverters recorded as Enphase.

Across all years, 1 of PHOENIX ENERGY FULFILLMENT INC DBA PHOENIX SOLAR ENERGY’s 227 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (1, 100.0%) used batteries recorded as LG.

1 of 1 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerMission Solar0117
Qcells049
JinkoSolar045
JA Solar08
Solaria04
Inverter makerEnphase0225
SolarEdge02
Battery makerLG01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 227 of 227 installs, inverters on 227. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1039195Not found in the CSLB License Master file pulled Nov 4, 2026225

License numbers are the ones the utilities recorded on the interconnection applications (227 of 227 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Local solar permits naming its license

Solar permits in city and county open data that list PHOENIX ENERGY FULFILLMENT INC DBA PHOENIX SOLAR ENERGY’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense2019Total
City and County of San Francisco103919544

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
Butte110
Tehama30
Glenn26
Sutter15
Shasta12
Humboldt8
Yuba8
Colusa7
San Joaquin2
Solano2
Sonoma2
Contra Costa1
Mendocino1
Napa1
San Mateo1
Yolo1

Top cities

CityInstalls
Chico94
Orland21
Red Bluff20
Oroville13
Yuba City12
Anderson9
Colusa7
Mckinleyville7
Cottonwood5
Corning4
Marysville4
Wheatland4
Willows4
Gerber2
Rohnert Park2

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
PHOENIX ENERGY FULFILLMENT INC DBA PHOENIX SOLAR ENERGY225
PHOENIX ENERGY FULFILLMENT INC DBA PHOEN2

Common questions

Where does PHOENIX ENERGY FULFILLMENT INC DBA PHOENIX SOLAR ENERGY install solar?

Its installs are spread across 16 counties. The most are in Butte County (110 installs), followed by Tehama County (30).

How often does PHOENIX ENERGY FULFILLMENT INC DBA PHOENIX SOLAR ENERGY install batteries with solar?

0.4% of its interconnected solar installs include battery storage across all years.

How many PHOENIX ENERGY FULFILLMENT INC DBA PHOENIX SOLAR ENERGY installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 227 interconnected installs with a tariff recorded (227) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.