PIONEER SOLAR SERVICES

How many solar installs has PIONEER SOLAR SERVICES done in California, and which license number is on its installs?

PIONEER SOLAR SERVICES has 212 residential solar installs interconnected in California, active in the records from 2020 through 2025 (Dec 14, 2020 to Sep 16, 2025), most of them in Nevada County (87), San Joaquin County (55) and Contra Costa County (19). The license number recorded on most of its installs, 1069957, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
212
Last 24 months
1
Total capacity
1,682.9 kW DC
Median system size
7.3 kW DC
With battery storage
11.3% all time; 0.0% last 24 months
Third-party owned
0.0% of 212 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
none recorded
Median battery size
10 kWh (9 installs list a capacity)
First install
Dec 14, 2020
Latest install
Sep 16, 2025
Counties
25
Utilities
PGE 212
CSLB license
1069957

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2020 to 2026

YearInstalls interconnectedWith battery storage
202010
2021485
20229214
2023654
202451
202510
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 212 interconnected installs with a tariff recorded (212) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.0212100.0%24 (11.3%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on PIONEER SOLAR SERVICES’s installs. No residential system in the file lists a third-party owner name that matches PIONEER SOLAR SERVICES exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, none of PIONEER SOLAR SERVICES’ 1 installs name a module maker in the “Generator Manufacturer” fields; the fields are blank or unreadable on those records.

In the last 24 months, 1 of PIONEER SOLAR SERVICES’ 1 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (1, 100.0%) used inverters recorded as ABB.

In the last 24 months, none of PIONEER SOLAR SERVICES’ 1 installs name a battery maker in the “Generator Manufacturer” fields; the fields are blank or unreadable on those records.

17 of 24 battery-paired PG&E and SCE installs (70.8%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerCertainTeed0191
Qcells05
Storz Power04
Fortress Power LLC03
LG02
Inverter makerABB11
Enphase1146
Battery makerEnphase015
LG02

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 200 of 212 installs, inverters on 212. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names PIONEER SOLAR SERVICES as developer on 5 battery storage projects and as installer on 6 (4 name it as both), 7 projects in all with 139 kWh of storage. 4 have the status Paid, with $67,604 in current incentive allocations. Applications were received from Aug 5, 2021 to Mar 5, 2024.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid484$67,604
Cancelled355$55,338

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Equity Resiliency6120$120,0303$64,692
Small Residential Storage119$2,9121$2,912

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1069957Not found in the CSLB License Master file pulled Nov 4, 2026212

License numbers are the ones the utilities recorded on the interconnection applications (212 of 212 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Local solar permits naming its license

Solar permits in city and county open data that list PIONEER SOLAR SERVICES’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense2022Total
unincorporated San Diego County106995711

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
Nevada87
San Joaquin55
Contra Costa19
Alameda6
Placer6
Solano4
Yuba4
El Dorado3
Santa Cruz3
Tuolumne3
Butte2
Merced2
San Mateo2
Santa Clara2
Sonoma2
Sutter2
Yolo2
Amador1
Calaveras1
Fresno1
Kern1
Madera1
Marin1
Napa1
Stanislaus1

Top cities

CityInstalls
Stockton40
Grass Valley38
Nevada City36
Penn Valley10
Antioch5
Manteca4
Auburn3
Lathrop3
Oakland3
Ripon3
Smartsville3
Tracy3
Danville2
Fairfield2
Martinez2

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
PIONEER SOLAR SERVICES212

Common questions

Where does PIONEER SOLAR SERVICES install solar?

Its installs are spread across 25 counties. The most are in Nevada County (87 installs), followed by San Joaquin County (55).

How often does PIONEER SOLAR SERVICES install batteries with solar?

11.3% of its interconnected solar installs include battery storage across all years, and 0.0% in the last 24 months (0 of 1).

How many PIONEER SOLAR SERVICES installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 212 interconnected installs with a tariff recorded (212) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.