Rayker Inc DBA Greenspire Construction

How many solar installs has Rayker Inc DBA Greenspire Construction done in California, and which license number is on its installs?

Rayker Inc DBA Greenspire Construction has 1,394 residential solar installs interconnected in California, active in the records from 2018 through 2025 (Feb 16, 2018 to Dec 29, 2025), most of them in Riverside County (428), Los Angeles County (407) and San Bernardino County (315). The license number recorded on most of its installs, 1018241, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
1,394
Last 24 months
15
Total capacity
9,157.2 kW DC
Median system size
6 kW DC
With battery storage
4.2% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 69.2% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
57.0% of 1,394 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
186 installs, latest Dec 29, 2025
Ownership types recorded
PPA 790, lease 1, prepaid lease 3, other 1
Median battery size
5 kWh (53 installs list a capacity)
First install
Feb 16, 2018
Latest install
Dec 29, 2025
Counties
12
Utilities
SCE 1,242, SDGE 138, PGE 14
CSLB license
1018241

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2018 to 2026

YearInstalls interconnectedWith battery storage
20181710
20193661
20201161
2021970
20222190
202336115
20245530
202596
2026 (through Aug 31, 2026)00

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

186 of its 1,394 interconnected installs (13.3% of the 1,394 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 23.3% of those on PG&E and SCE records include battery storage. The latest Net Billing Tariff install was approved Dec 29, 2025.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.01,20886.7%11 (1.0%)
Net Billing Tariff18613.3%42 (23.3%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 795 of Rayker Inc DBA Greenspire Construction’s installs the utility recorded a third-party ownership type: PPA 790, lease 1, prepaid lease 3, other 1. Across all installers, 73 residential systems list a third-party owner name that matches Rayker Inc DBA Greenspire Construction exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
Sun Run Inc308
SUNNOVA142
Sunrun120
Greenspire88
RAYKER INC DBA Greenspire Construction73

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 15 of Rayker Inc DBA Greenspire Construction’s 15 installs name a module maker in the “Generator Manufacturer” fields, and most of those (9, 60.0%) used modules recorded as LONGi.

In the last 24 months, 15 of Rayker Inc DBA Greenspire Construction’s 15 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (15, 100.0%) used inverters recorded as Enphase.

In the last 24 months, 9 of Rayker Inc DBA Greenspire Construction’s 15 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (9, 100.0%) used batteries recorded as Enphase.

53 of 53 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerLONGi9122
Canadian Solar5571
Hyundai128
REC1not in top list
SolarWorld1not in top list
Inverter makerEnphase15481
Battery makerEnphase948

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 1,349 of 1,394 installs, inverters on 1,394. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1018241Not found in the CSLB License Master file pulled Nov 4, 20261,394

License numbers are the ones the utilities recorded on the interconnection applications (1,394 of 1,394 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Local solar permits naming its license

Solar permits in city and county open data that list Rayker Inc DBA Greenspire Construction’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense2018201920202021202220232024Total
unincorporated San Diego County10182419217211142

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
Riverside428
Los Angeles407
San Bernardino315
San Diego128
Ventura57
Orange42
Lake6
Kern5
Sonoma3
Alameda1
Contra Costa1
Santa Barbara1

Top cities

CityInstalls
Moreno Valley121
San Bernardino77
Hemet57
Palmdale56
Fontana49
Pomona47
San Diego45
Corona42
Simi Valley40
San Jacinto28
Perris27
Lancaster26
Rialto26
Canyon Country25
Lake Elsinore23

Names as recorded by the utilities

The utilities recorded this installer under 6 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
RAYKER INC DBA GREENSPIRE CONSTRUCTION499
Rayker Inc DBA Greenspire Construction466
RAYKER INC DBA Greenspire Construction254
RAYKER INC159
Rayker Inc13
Rayker Inc. DBA Greenspire Construction3

Common questions

Where does Rayker Inc DBA Greenspire Construction install solar?

Its installs are spread across 12 counties. The most are in Riverside County (428 installs), followed by Los Angeles County (407).

How often does Rayker Inc DBA Greenspire Construction install batteries with solar?

4.2% of its interconnected solar installs include battery storage across all years, and 69.2% in the last 24 months (9 of 13). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Rayker Inc DBA Greenspire Construction installs are under NEM 3.0 (the Net Billing Tariff)?

186 of its 1,394 interconnected installs (13.3% of the 1,394 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 23.3% of those on PG&E and SCE records include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.